Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-02410
StatusFinaled
Name SLETTEN CONSTRUCTION
Site Address 10541 W OVERLAND RD
Project NameU.S. Bank
Customer Number 
ePlanReviewYes
Description
(US BANK – RESTROOM REMODEL) Permit for remodel of the restrooms within the existing 3,688 sq. ft. bank tenant space to make two single user unisex restrooms. According to ADA county records this building was built in the county in 1979 and annexed in the city in 1999, there are no record on file in the city for this tenant space but plans from the adjacent tenant space suggest US Bank has been the tenant since 2001. Approval is contingent upon adhering to the approved plans on file. Scope of work to include removal of select interior nonbearing walls, removal of select door/door frames, removal of select millwork, removal of select restroom fixtures, removal of floor finishes, construction of select new interior nonbearing walls, select new door/door frames, millwork, select new accessible grab bars, select new gypsum ceiling, plumbing work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 2/17/20202/13/2020 DONE
This permit finaled on the web by Dustin Keyes
First Notice12/30/201912/30/20192/7/2020 DONE
DetailsMike Jordan
mailed 2-10-20
BLD-Final12/27/201912/30/201912/30/2019APASS
DetailsMike Jordan
The building is not open until 9 a.m. Patrick can be onsite in 15 minutes if you give him a call. Phone #: ###-#### Inspection requested via web by Dustin Keyes
DOC - Permit Finaled12/30/201912/30/201912/30/2019PPASS
DetailsMike Jordan
FIRE-Final Inspection12/27/201912/27/201912/27/2019PPASS
DetailsJim Page
No fire sprinkler modifications in scope of work, no fire alarm modifications in scope of work, fire extinguisher is in common area with a current inspection tag. Final life fire safety inspection for scope of work complete, signatures provided on permit sign off card.

Sorry we missed you this morning. The ban doesn''t open until 9 a.m. and with work being done we don''t have a super onsite. If you can call Patrick at the number above he should be able to be onsite in 10-15 minutes from when you want to arrive. Phone #: ###-#### Inspection requested via web by Dustin Keyes
FIRE-Final Inspection12/26/201912/27/201912/27/2019AFAIL
DetailsJim Page
Called point of cotact listed with no answer, left a message, went to project and doors were locked, inspection was not performed, life fire safety inspection will need to be rescheduled, proceeded to next inspection.

Fire life safety final Phone #: ###-#### Inspection requested via web by Dustin Keyes
BLD-Final12/23/201912/26/201912/26/2019ANR
DetailsDave Hannah
Please call because I won''t have anyone onsite. I can be there within 10 minutes Phone #: ###-#### Inspection requested via web by Dustin Keyes needs plumbing and fire finals
Issue PAID IN FULL permit  8/2/2019 DONE
Inspection Record Card- Bld  8/2/2019 DONE
Telephone call  8/1/2019 DONE
GC and 306 form emailed to -Dustin Keyes
Plan assigned to (JG)7/5/20197/5/20197/31/2019 PASS
DetailsJavier Guzman
2nd rev comp, 07/09 L1 US Bank Restroom Remodel ePlan
Routing - PLAN CHECK7/31/2019 7/31/2019 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  7/31/2019 DONE
Permit Ready to Issue  7/31/2019 DONE
MET DKEYES@SLETTENINC.COM
NEED
GC FORM
REVISED VALUE
Route to Impact Fee Review7/9/20197/12/20197/10/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Routing - PLAN CHECK7/5/2019 7/9/2019 FAIL
DetailsJavier Guzman
Routing PW Flood Plain7/5/2019 7/9/2019 PASS
DetailsJason C. Taylor
Project is outside Special Flood Hazard Area, no floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
1st review completed  7/9/2019 FAIL
DetailsJavier Guzman
Routing - Addressing7/5/2019 7/5/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS7/5/2019 7/5/2019 PASS
DetailsMorgan Webb
CREDIT FOR DEMO.
Intake Approval  7/3/2019 PASS
Intake Approval  6/28/2019 FAIL
DetailsBrian McGowan
Please provide the following for the Prescreen to be approved;
1. Code Analysis and Building Data are REQUIRED.
Application received  6/27/2019 DONE
Application submitted via PDS Online on Jun 27 2019 12:03PM