BLD-Final | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | PASS |
Mike Jordan
|
|
|
DOUG Phone #: ###-####
|
DOC - Permit Finaled | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 9/30/2019 | 10/1/2019 | 10/1/2019 | A | CANC |
Mike Jordan
|
|
|
Doug Phone #: ###-####
|
BLD-Wall Bracing | 10/1/2019 | 10/1/2019 | 10/1/2019 | A | PASS |
Mike Jordan
|
|
|
Doug Phone #: ###-####. Ok to cover exterior.
|
BLD-Framing/Rough-in | 9/30/2019 | 9/30/2019 | 9/30/2019 | P | NR |
Mike Jordan
|
|
|
Doug Phone #: ###-####. Needs to nail off portal frame.
|
Routing Walk-In (Zoning) | 9/4/2019 | 9/4/2019 | 9/4/2019 | A | PASS |
Jeff Lowe
|
|
|
plan mod
|
Plan assigned to (JAB) Josh | 9/4/2019 | 9/4/2019 | 9/4/2019 | | PASS |
Josh Bogle
|
|
|
plan mod
|
Routing - PLAN CHECK | 9/4/2019 | | 9/4/2019 | | PASS |
Josh Bogle
|
|
|
double checked shear for 10' walls
|
Case Summary (BLD) | | | 9/4/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 9/4/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/4/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 9/4/2019 | | DONE |
|
|
|
changing a 9ft to a 10ft pole
|
BLD-Footing | 7/29/2019 | 7/29/2019 | 7/29/2019 | P | PASS |
Mike Jordan
|
|
|
Doug Phone #: ###-####
|
BLD-Footing | 7/25/2019 | 7/26/2019 | 7/26/2019 | P | FAIL |
Tell Riley
|
|
|
Derrik Phone #: ###-####//need property pins to verify setbacks//
|
Routing Walk-In (BLD) | 7/25/2019 | 7/25/2019 | 7/25/2019 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 7/24/2019 | 7/24/2019 | 7/25/2019 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/25/2019 | | 7/25/2019 | | PASS |
Josh Bogle
|
|
|
fee per added value
|
Case Summary (BLD) | | | 7/25/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 7/25/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/25/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 7/24/2019 | | DONE |
|
|
|
plan modification - per Doug Kruse. footing change. Sheet A.101 and A.1.2
|
Routing Walk-In (Zoning) | 6/28/2019 | 6/28/2019 | 6/28/2019 | P | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 6/28/2019 | 6/28/2019 | 6/28/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/28/2019 | | 6/28/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 6/28/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/28/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/28/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 6/28/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/28/2019 | | DONE |
|
|
|
|
Application received | | 6/28/2019 | | | |
|
|
|
|