Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-02442
StatusIssued
Name FOOD TECH INC
Site Address 618 N ALLUMBAUGH ST
Project NameDarigold Bottling Line Expand
Customer Number 
ePlanReviewYes
Description
(DARIGOLD BOTTLING LINE EXPANSION – BUILDING ADDITION ON THE EAST) (DRH18-00482) (5-29-20 PLAN MODIFICATION TO REMOVE THE 14,900 SQUARE FOOT AREA 3 ADDITION FROM THE SCOPE OF WORK, TO CHANGE THE MECHANICAL AND ELECTRICAL SYSTEMS, TO REVISE THE STRUCTURAL DESIGN, TO RELOCATE THE SHIPS LADDER PROVIDING ACCESS TO THE ROOF TOP MECHANICAL UNITS, TO RELOCATE A ROOF TOP SHIPS LADDER, TO WIDEN THE NORTHEAST DRIVEWAY, AND TO CHANGE THE SITE UTILITY ROUTING. THE PROPOSED WATTS PER SQUARE FOOT USED FOR LIGHTING IS DECREASING. AREA 3 IN THE SOUTHEAST CORNER OF THE BUILDING WILL BE CONSTRUCTED IN THE FUTURE UNDER PHASE 2. A SEPARATE PERMIT IS REQUIRED FOR THAT ADDITION.) The fire sprinkler system is used for unlimited area of the building and for fire flow. To construct a 36,220 square foot addition (32,528 square feet 1st story and 3,692 square feet 2nd story) to an existing 99,182 square foot building (91,712 square feet 1st story and 7,470 square feet 2nd story). The addition will be used as a processing, filling, packaging, and palletizing space for fluid milk. Work is to include concrete footings, concrete piers, steel columns with steel base plates, precast concrete tilt-up exterior walls with integral insulation, steel braced frames, steel moment frames, concrete slabs on grade, steel roof joists, roof supported trolley beams, steel roof decks, continuous insulation installed on top of the roof deck, a membrane roof covering, insulated metal panels, side-hinged swinging doors, overhead doors, loading dock levelers, and roof top stairways. The new 1,850 square foot 2nd story within the new addition includes steel columns, steel beams, steel moment frames, steel stairway, steel guards, concrete and steel deck composite floor, a ships ladder to the roof, 2-hr fire-resistance-rated 2nd story, and a 2-hr enclosed stairway used for travel distance reduction. To remodel an existing 11,540 square foot area of the existing building. Much of the existing concrete slab on grade, a 3,935 square foot existing roof, and roof coverings will be removed. Work is to include concrete footings, concrete mat foundation and concrete piers to support new tanks, steel columns with steel base plates, new openings in existing precast concrete walls with steel plate headers, steel braced frames, steel moment frames, concrete slabs on grade, steel roof trusses, roof supported trolley beams, insulated metal panels, steel roof deck, continuous insulation installed on top of the new roof deck, a membrane roof covering on the new roof, and a new roof covering on an existing roof. The new 1,842 square foot 2nd story within the existing building includes steel columns, steel beams, steel braced frames, steel moment frames, steel plate floor, steel catwalks, steel stairways, steel guards, and a concrete and steel deck composite floor. Special Inspection is required for soils, concrete, steel (including bolting and welding), and for anchors post-installed in hardened concrete. The design for the open web steel roof joists and the design for the precast concrete tilt-up wall panels with integral insulation are deferred submittal items. A separate permit is required for racking. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. This permit is intended to establish a Certificate of Occupancy only for the addition and for the remodeled areas. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW** Mechanical Commissioning is required. The report must be submitted to Mechanical supervisor for approval before final inspection.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in8/12/20208/12/20208/12/2020APART
DetailsMike Jordan
There is no electrical or plumbing in these walls or ceilings so I am requesting a framing close-in Inspection requested via web by David Booth. roof framing for raising existing ceiling in seperator room.
BLD-Concrete8/4/20208/5/20208/5/2020PPASS
DetailsMike Jordan
Rebar inspection for a slab on grade. If possible, please make this inspection as late in the day as possible, thanks. Phone #: ###-#### Inspection requested via web by David Booth. Rebar for interior slab on grade and column pad footings in seperator room.
BLD-Concrete7/29/20207/31/20207/31/2020PPASS
DetailsMike Jordan
This is for a slab on grade rebar inspection. If possible, please schedule this inspection for as late in the day as possible. Thanks. Inspection requested via web by David Booth. Remainder of interior slab on grade for VTIS room.
BLD-Foundation7/30/20207/30/20207/30/2020APASS
DetailsMike Jordan
Late request, but we are trying to pour a foundation at 9:00 AM and would need a rebar inspection. Inspection requested via web by David Booth. Interior column pad footing at grids 7 and K.
BLD-Concrete7/27/20207/28/20207/28/2020PPASS
DetailsMike Jordan
This is for a slab on grade rebar inspection. If possible, please make this inspection as late in the day as possible, thanks. Inspection requested via web by David Booth. Reinforcement for interior slab on grade for last placement of bottling room.
BLD-Foundation7/24/20207/27/20207/27/2020PPASS
DetailsMike Jordan
This request is for a rebar inspection. If possible, we would prefer as late in the day as possible. Thank you. Inspection requested via web by David Booth. Elevated slab on deck for new switch gear room for VTIS.
BLD-Foundation7/23/20207/23/20207/23/2020PPASS
DetailsBrandon Shaw
Rebar inspection...
BLD-Concrete7/17/20207/20/20207/20/2020PPASS
DetailsMike Jordan
Rebar inspection for slab on grade Inspection requested via web by David Booth. Interior slab on grade area S3, bottling room.
BLD-Concrete7/16/20207/17/20207/17/2020ADEFR
DetailsMike Jordan
Rebar inspection for slab on grade Phone #: ###-#### Inspection requested via web by David Booth. Ok pending special inspection.
BLD-Footing7/8/20207/9/20207/9/2020PPASS
DetailsMike Jordan
Rebar Inspection requested.

Dave Booth
###-#### Phone #: ###-#### Inspection requested via web by David Booth. Perimeter footings for ESL expansion.
BLD-Conference6/16/20206/17/20206/17/2020ADONE
DetailsMike Jordan
John Phone #: ###-####. General walk through of project, met with contractor and discussed expectations.
CHANGE STATUS TO (ISS)  6/2/2020 DONE
OVERRIDE  6/1/2020  
CHANGE STATUS TO (ISS)  6/1/2020 DONE
Permit Ready to Issue  6/1/2020 DONE
accidentally put back into issued status. Fees must still be paid.
OVERRIDE  5/29/2020  
Plan assigned to (CJW)5/1/20205/1/20205/29/2020 PASS
DetailsCarl Westfall
plan mod 1 - Darigold
Permit Ready to Issue  5/29/2020 DONE
all met: Adam Charron acharron@foodtech.com

Need
Revised Cert of Value for Plan mod (app states value is affected)
Routing - FIRE5/13/2020 5/28/2020 PASS
DetailsJoe Bruce
Attached comments to case. PIV or WPIV will be required since applicant does not have a 1-hour fire riser room separation per Boise City Code. **JHB**
Plan Reviewer's activity  5/28/2020 PASS
Plan mod approved
Routing Off Site - STRUCTURAL5/13/2020 5/27/2020 PASS
DetailsCarl Westfall
Jan Welch (Stapley)
Routing PW Environmental5/13/2020 5/26/2020 PASS
DetailsZach Conde
PER ZACH: Passed on ePlan with no comments. Please pass on Tidemark.
Routing - PLANNING5/13/2020 5/20/2020 PASS
DetailsDavid Moser
Routing - Design Review5/13/2020 5/19/2020 PASS
DetailsJosh Wilson
Routing - PLUMBING5/13/2020 5/15/2020 PASS
DetailsDan Ediger
Per plan and ISPC
Routing - PUBLIC WORKS5/13/2020 5/13/2020 PASS
DetailsMorgan Webb
Routing - PLAN CHECK5/8/2020 5/13/2020 PASS
DetailsCarl Westfall
IBC plan review approved. Workflow came back from the permits desk late on a Friday. (i.e. 4:36 PM). Plans Examiner was not aware that it had come back. Plans Examiner was out of the office until May 13. He routed the drawings on May 13 early in the morning after he got back in the office.
Routing - MECHANICAL5/13/2020 5/13/2020 PASS
DetailsTroy James
Routing - PLAN CHECK5/4/2020 5/7/2020 PASS
DetailsCarl Westfall
Plan intake review approved
Plan Modification Accepted  5/4/2020 DONE
Workflow in ePlanReview received
Plan Modification Accepted  5/1/2020 DONE
plan mod 1
Telephone call  1/2/2020 DONE
called and left a message for John DeMarco asking for the signed permit.
Telephone call  12/23/2019 DONE
emailed John DeMarco and Clay asking for a signed permit
Issue PAID IN FULL permit  12/19/2019 DONE
(F) Reprint permit  12/19/2019 DONE
Print Occupancy Form  12/19/2019 DONE
Telephone call  12/16/2019 DONE
Emailed John DeMarco letting him know that we still need an RP before we can issue the permit
Expiration Notice12/6/201912/30/201912/6/2019 DONE
DetailsBrittany Hill
Telephone call  12/5/2019 DONE
Sent an email to Paul Kafer informing him what needs to be turned in for us to add fees and for issuance
OVERRIDE  11/20/2019  
Plan assigned to (CJW)7/29/20199/6/201911/20/2019 PASS
DetailsCarl Westfall
(1st done) 08/30/19 (New Building - 25 days) (eplan - 250 sheets) Darigold Bottle Line Expansion (routed to staff)
PLANS/APPL TAKEN TO FRONT DESK  11/20/2019 DONE
Permit Ready to Issue  11/20/2019 DONE
ALL MET

NEED ACHD - waiting for email receipt

met: jdemarco@foodtech.com
RP
GC Form
Revised Cert of Value
Routing Off Site - STRUCTURAL11/8/2019 11/19/2019 PASS
DetailsCarl Westfall
Jan Welch (Stapley)
Routing - PLUMBING11/8/2019 11/19/2019 PASS
DetailsDan Ediger
Per ISPC 2017 and Plans.
Routing PW Street Lights11/8/2019 11/14/2019 PASS
DetailsTom Marshall
Streetlights will be tracked under project BLD19-04129.
Routing - PLAN CHECK11/7/2019 11/8/2019 PASS
DetailsCarl Westfall
pending structural - remember to upload the IBC plan review report
Plan resubmittals received  11/7/2019 DONE
Plan resubmittals requested  10/30/2019 DONE
Routing - FIRE10/17/201910/17/201910/29/2019 PASS
DetailsMark Scharfen
Attached revised comments to case
Routing PW Drainage10/17/2019 10/28/2019 PASS
DetailsBrian Murphy
Routing - PLUMBING10/17/2019 10/25/2019 FAIL
DetailsDan Ediger
See changemarks
Routing Off Site - STRUCTURAL10/17/2019 10/23/2019 FAIL
DetailsCarl Westfall
Jan Welch (Stapley)
Routing - PLAN CHECK10/16/2019 10/23/2019 PASS
DetailsCarl Westfall
pending structural
Routing - MECHANICAL10/17/2019 10/22/2019 PASS
DetailsTroy James
Routing PW Street Lights10/17/2019 10/17/2019 FAIL
DetailsTom Marshall
Plan resubmittals received  10/16/2019 DONE
Route to Impact Fee Review9/10/20199/13/20199/11/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Routing - FIRE7/29/20198/2/20199/10/2019 FAIL
DetailsMark Scharfen
09/10 - 502 Darigold Bottle Line Expansion fire review complete. Uploaded and emailed to architect rev_fire 09.10.2019.pdf
Routing - PLAN CHECK7/29/2019 9/10/2019 FAIL
DetailsCarl Westfall
Revised drawings required.
1st review completed  9/10/2019 DONE
Plan resubmittals requested  9/10/2019 DONE
Case Summary (BLD)  8/19/2019 DONE
Case Summary (BLD)  8/19/2019 DONE
Routing Off Site - STRUCTURAL8/2/2019 8/16/2019 FAIL
DetailsCarl Westfall
Jan Welch (Stapley)
Routing PW Drainage8/2/2019 8/14/2019 FAIL
DetailsBrian Murphy
need seepage bed detail with c-33 sand, apendx j,siw forms lxw d
Routing PW Environmental8/2/2019 8/14/2019 PASS
DetailsRick Christenson
Pretreatment reviews as needed moving forward.
Routing - MECHANICAL7/29/2019 8/8/2019 FAIL
DetailsTroy James
See Eplan
Routing - PLUMBING7/29/2019 8/8/2019 FAIL
DetailsDan Ediger
See Changemark
Routing - PLANNING7/29/2019 8/8/2019 PASS
DetailsNicolette Womack
Routing - Design Review7/29/2019 8/8/2019 PASS
DetailsAndrea Tuning
Routing PW Sewer Design8/2/2019 8/7/2019 PASS
DetailsDeAnn Brown
Building addition waste piping connects to existing waste piping. No new connections to wet-line sewer just additional flow.
Routing PW Solid Waste8/2/2019 8/6/2019 PASS
DetailsEvan Carpenter
Routing - Erosion and Sediment7/29/2019 8/6/2019 PASS
DetailsMichael Zawacki
Site prep inspection required.
Listed RP Paul Kaefer does not have certification. Valid RP needed or proof of enrollment or completed ESC training.
Routing - Addressing7/29/2019 8/5/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS7/29/2019 8/5/2019 PASS
DetailsAngela Hardy
Routing PW Street Lights8/2/2019 8/2/2019 FAIL
DetailsTom Marshall
Need street light plan.
Intake Approval  7/29/2019 PASS
DetailsJoe Bruce
Intake Approval  7/8/2019 FAIL
DetailsJoe Bruce
Provide the following items to complete the prescreen process:
1) Plan sheets do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” (4"x4" on cover) space located 3” off the right sheet edge to allow for the title block. Verify ALL plan sheets have the required space for city approval stamp. Please refer to this document for our submittal standards: https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
2) Site Specific Fire Flow at the fire hydrant letter is required from Suez Water. Upload this document into the documents folder.
3) Form #310 – “Statement of Special Inspections” is missing the signature and information of the building owner, design professional, and special inspections firm. Provide this information on the form.
4) Provide Erosion & Sediment Control Narrative and upload this document into the “documents” folder.
5) Drawing files shall be less than 2MB. Drawings that exceed this file size need to be reduced for view the files on a cloud-based system. Re-publish all drawings that are over 2MB and/or flatten PDF drawings to reduce the files size.
6) Heating and Cooling Load Calculations could not be located on the plans. Provide calculations and location where the load calcs are located.
Application received  7/1/2019 DONE
Application submitted via PDS Online on Jul 1 2019 8:52AM