BLD-Final | 5/19/2020 | 5/22/2020 | 5/22/2020 | A | DONE |
Tony Young
|
|
|
Screened- Danny Phone #: ###-####
|
BLD-Conference | 5/18/2020 | 5/18/2020 | 5/22/2020 | P | DONE |
Tony Young
|
|
|
Screened- Danny Phone #: ###-####
|
BLD-Final | 5/15/2020 | 5/15/2020 | 5/22/2020 | P | PASS |
Tony Young
|
|
|
Screened- Danny Phone #: ###-####
|
DOC - Permit Finaled | 5/22/2020 | 5/22/2020 | 5/22/2020 | P | PASS |
Tony Young
|
|
|
|
Issue PAID IN FULL permit | | | 5/11/2020 | | DONE |
|
|
|
|
Telephone call | | | 5/11/2020 | | DONE |
|
|
|
Accidentally re-issued permit.
|
Plan assigned to (JAB) Josh | 4/14/2020 | 4/14/2020 | 5/8/2020 | | PASS |
Josh Bogle
|
|
|
04/20 mod, ePlan - 1st done
|
Routing PW Grading-Hillside | 5/8/2020 | | 5/8/2020 | | PASS |
Melissa Jannusch
|
|
|
Plan mod for boulder wall approved.
|
Routing - PLAN CHECK | 5/8/2020 | | 5/8/2020 | | PASS |
Josh Bogle
|
|
|
boulder wall OK
|
Routing - PLANNING | 5/8/2020 | | 5/8/2020 | | PASS |
David Moser
|
|
|
|
Override - Parcel Holds | | | 5/8/2020 | | |
|
|
|
|
Permit Ready to Issue | | | 5/8/2020 | | DONE |
|
|
|
DO NOT ISSUE- plan mod approved
|
Routing - PLANNING | 4/15/2020 | | 5/1/2020 | | FAIL |
David Moser
|
|
|
plan mod, new cals, geo tech.
will need to be routed to PW (melissa), planning and building
Provide boulder wall approval letter from Focus Engineering for boulder wall construction.
|
Plan Reviewer's activity | | | 4/28/2020 | | DONE |
Josh Bogle
|
|
|
accepted and routed resubmittal
|
Routing - PLANNING | 4/28/2020 | | 4/28/2020 | | DONE |
Sue Cummings
|
|
|
Sent to Daivid M.
|
Routing - PLAN CHECK | 4/27/2020 | | 4/27/2020 | | FAIL |
Josh Bogle
|
|
|
scope is unclear
|
Routing PW Grading-Hillside | 4/15/2020 | | 4/22/2020 | | FAIL |
Melissa Jannusch
|
|
|
See changemarks in ePlan. Additional documents needed and higher resolution grading and drainge plans needed.
|
Routing - PUBLIC WORKS | 4/15/2020 | | 4/15/2020 | | PASS |
Candy A. Nichols
|
|
|
plan mod, new cals, geo tech.
will need to be routed to PW (melissa), planning and building
|
Plan Modification Accepted | | | 4/14/2020 | | DONE |
|
|
|
plan mod, new cals, geo tech.
will need to be routed to PW (melissa), planning and building
|
BLD-Wall cover | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | PASS |
Tony Young
|
|
|
Good morning! I think I’m in shape to have an inspection to drywall the garage and the ADU! Plumbing and electrical inspections were done for this permit. If you struggle to find wether or not the mechanical was inspected refer to permit number MEC19-03921 it was inspected by Ben on 090419. Please, call or text with concerns! Thanks D Phone #: ###-#### Inspection requested via web by Danny Utterbeck/// energy code ok.. ok to cover
|
Routing Walk-In (BLD) | 9/10/2019 | 9/10/2019 | 9/10/2019 | A | PASS |
Josh Bogle
|
|
|
just chatting
|
BLD-Wall cover | 9/9/2019 | 9/9/2019 | 9/9/2019 | P | FAIL |
Jim Storey
|
|
|
Tony, had the final insulation done this morning and need to inspect for cover. I have a few appointments this afternoon but, can take a phone call! Thanks, Danny Phone #: ###-#### Inspection requested via web by Danny Utterbeck//// Dwelling Unit. All work per plans, notations, attachments, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. Deferred submittlas for Special Inspections. **JAB**
|
Telephone call | | | 9/9/2019 | | DONE |
|
|
|
Jim Storey called,,,said the sub's are not attached to this ADU-i told him they needed to pull seperate permits for the ADU and the house. The sub contractors will need to come in and fix any permits that are combined and pull seperate permits for each building permits
|
CHANGE STATUS TO (ISS) | | | 9/9/2019 | | DONE |
|
|
|
I changed status back to ISS becasue there is no notes or anything stating why it was changed to REV. I also attached the BLD to the PRJ becasue it was unattached for some reason with no notes. CAN
|
BLD-Energy code compliance | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | NR |
Tony Young
|
|
|
Need inspected for cover up! Please call or text Danny with questions. Phone #: ###-#### Inspection requested via web by Danny Utterbeck
|
BLD-Framing/Rough-in | 9/3/2019 | 9/4/2019 | 9/4/2019 | A | PART |
Tony Young
|
|
|
Danny Phone #: ###-####,, ok to insulate,, needs fire blocking at the top of the double wall
|
BLD-Framing/Rough-in | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | DEFR |
Tony Young
|
|
|
Danny Phone #: ###-####,, needs mech
|
BLD-Framing/Rough-in | 8/30/2019 | 9/3/2019 | 9/3/2019 | A | NR |
Tony Young
|
|
|
Danny Phone #: ###-####,, needs trades passed
|
BLD-Framing/Rough-in | 8/29/2019 | 8/30/2019 | 8/30/2019 | A | NR |
Tony Young
|
|
|
Danny Phone #: ###-####,, needs mech and seal pack
|
BLD-Framing/Rough-in | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | NR |
Tony Young
|
|
|
Danny Phone #: ###-####,, no plans
|
Route to Impact Fee Review | 8/28/2019 | 8/31/2019 | 8/29/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Issue PAID IN FULL permit | | | 8/29/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 8/28/2019 | 9/3/2019 | 8/28/2019 | | PASS |
Shannon Cade
|
|
|
|
Permit Ready to Issue | | | 8/28/2019 | | DONE |
|
|
|
|
Telephone call | | | 8/28/2019 | | DONE |
|
|
|
Spoke with Danny to inform the permit is ready and what fees are due.
|
Routing Walk-In (Zoning) | 8/27/2019 | 8/27/2019 | 8/27/2019 | P | PASS |
David Moser
|
|
|
approved as redlined, driveway shall be paved
|
Routing - PLAN CHECK | 8/27/2019 | | 8/27/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/27/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/27/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/27/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Routing - PLAN CHECK | 8/22/2019 | | 8/23/2019 | | FAIL |
Josh Bogle
|
|
|
failed pending Planning approval & clarification from the applicant on attic insulation/ventilation
|
Routing - MECHANICAL | | | 8/23/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 8/21/2019 | | 8/22/2019 | | FAIL |
David Moser
|
|
|
CAA19-00118, need a copy of recorded ADU deed restriction and conditions of approval, I also need a copy of a letter or email from Idaho Power indicating that you are work them regarding their power lines on the property. the driveway shall be paved.
|
Routing - Addressing | 8/19/2019 | | 8/21/2019 | | PASS |
Doug Chausow
|
|
|
ADU Address: 4776 W Hill Rd
|
Routing - PUBLIC WORKS | | | 8/21/2019 | | PASS |
|
|
|
ADU
|
Routing Walk-In (BLD) | 8/16/2019 | 8/16/2019 | 8/16/2019 | P | PASS |
Josh Bogle
|
|
|
took in for routing
|
Meeting | | | 8/16/2019 | | DONE |
|
|
|
per Tisha-needs to go through all departments for an ADU-All sub permits will need to be pulled new for this project. (fixture count)
|
Routing Walk-In (BLD) | 7/22/2019 | 7/22/2019 | 7/22/2019 | P | FAIL |
Josh Bogle
|
|
|
want to consult Plan Reviewer for ADU
|
Routing Walk-In (Zoning) | 7/3/2019 | 7/3/2019 | 7/3/2019 | P | FAIL |
Josh Bogle
|
|
|
needs to do ADU process before applying for BLD permit
|
Routing Walk-In (BLD) | 7/3/2019 | 7/3/2019 | 7/3/2019 | P | FAIL |
Josh Bogle
|
|
|
discussed the Plans & Process
|
Plan assigned to (JAB) Josh | 7/3/2019 | 7/3/2019 | 7/3/2019 | | DONE |
Carl D Madsen
|
|
|
|
1st review completed | | | 7/3/2019 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 7/3/2019 | | FAIL |
Josh Bogle
|
|
|
|
Intake Approval | | | 7/3/2019 | | PASS |
|
|
|
per JAB ok to take in and start around
|
PubWorks Occupancy Approval | 5/14/2020 | 5/14/2020 | | | DONE |
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
Application received | | 7/3/2019 | | | |
|
|
|
|