BLD-Aging Inspection | 5/14/2020 | 5/14/2020 | 5/21/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 5/13/2020 | 5/13/2020 | 5/14/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 12/30/2019 | 12/31/2019 | 12/31/2019 | A | PART |
Tony Young
|
|
|
This will be the framing of the garage only.
See you tomorrow!
- Mark Phone #: ###-#### Inspection requested via web by Mark McCutchan/// garage ok to cover the garage,, no need for energy inspection
|
BLD-Foundation | 10/8/2019 | 10/9/2019 | 10/9/2019 | P | PART |
Tony Young
|
|
|
corwin Phone #: ###-####,, fill in area,, work in progress,, ok
|
BLD-Foundation | 10/7/2019 | 10/8/2019 | 10/8/2019 | P | CANC |
Tony Young
|
|
|
Corwin Phone #: ###-####
|
BLD-Footing | 10/7/2019 | 10/8/2019 | 10/8/2019 | P | CANC |
Tony Young
|
|
|
Corwin Phone #: ###-####
|
BLD-Foundation | 10/3/2019 | 10/4/2019 | 10/4/2019 | P | PART |
Tell Riley
|
|
|
Corwin Phone #: ###-####//cut verts and lower horizontal bar for clearance at rear of garage//part of wall left out for truck access//ok to pour after bar is fixed//
|
BLD-Footing | 10/2/2019 | 10/3/2019 | 10/3/2019 | P | PASS |
Dave Hannah
|
|
|
Corwin Phone #: ###-####
|
Routing Walk-In (BLD) | 9/26/2019 | 9/26/2019 | 9/26/2019 | A | PASS |
Josh Bogle
|
|
|
|
BLD-Conference | 8/23/2019 | 8/23/2019 | 8/23/2019 | P | PEND |
Tony Young
|
|
|
see prior notes
|
BLD-Conference | 8/22/2019 | 8/23/2019 | 8/23/2019 | A | PEND |
Tony Young
|
|
|
CALL TO MEET THERE // CORWIN Phone #: ###-####,, old tanks found during excavation,, will compact and fill with 2" fractured washed rock ,, widen footings with more rebar
|
BLD-Wall Bracing | 8/12/2019 | 8/13/2019 | 8/13/2019 | A | PART |
Tony Young
|
|
|
stem // Erme Phone #: ###-####.. foundation for bedroom addition and storage room ok,, work in progress
|
BLD-Footing | 8/12/2019 | 8/12/2019 | 8/12/2019 | P | PART |
Tony Young
|
|
|
Erme Phone #: ###-####,, shed and addition footings ok,, setbacks appear ok
|
BLD-Footing | 8/8/2019 | 8/9/2019 | 8/9/2019 | P | NR |
Brandon Shaw
|
|
|
Erme Phone #: ###-####
|
OVERRIDE | | | 8/9/2019 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/9/2019 | | DONE |
|
|
|
plan mod
|
Routing - PLAN CHECK | 8/9/2019 | | 8/9/2019 | | PASS |
Josh Bogle
|
|
|
shed added
|
Case Summary (BLD) | | | 8/9/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 8/9/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 7/15/2019 | | |
|
|
|
|
Routing Walk-In (BLD) | 7/15/2019 | 7/15/2019 | 7/15/2019 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/15/2019 | | 7/15/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/15/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/15/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/15/2019 | | |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 7/15/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/15/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/12/2019 | | DONE |
|
|
|
Added as is footprint of current house, change garage walls to 10'. Added sections. Submitted sheets: G.1, Sheet G1.1, A1, A2.0, A2.1, A2.2, A3, A4, A6, A7, A8, A9, D1A10, A11
|
Telephone call | | | 7/12/2019 | | DONE |
|
|
|
Called Melinda to let her know we will need another set of plans (she only submitted one).
|
Routing Walk-In (Zoning) | 7/5/2019 | 7/5/2019 | 7/5/2019 | P | PASS |
Jeff Lowe
|
|
|
adu under separate permit
|
Routing Walk-In (BLD) | 7/5/2019 | 7/5/2019 | 7/5/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/5/2019 | | 7/5/2019 | | FAIL |
Josh Bogle
|
|
|
needs another Section view or two, as-builts, tall-wall engineering
|
1st review completed | | | 7/5/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 7/5/2019 | | | |
|
|
|
|