BLD-Conference | 1/10/2020 | 1/10/2020 | 1/10/2020 | P | PART |
Tell Riley
|
|
|
ok//shear nailing ok//will need to see STHD straps//
|
BLD-Foundation | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph Iaccino//west wall ok//will need to see east wall//
|
Routing Walk-In (BLD) | 1/10/2020 | 1/10/2020 | 1/10/2020 | P | PASS |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 10/4/2019 | 10/4/2019 | 10/4/2019 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/4/2019 | | 10/4/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/4/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/4/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/4/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Permit Ready to Issue | | | 10/4/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/4/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 9/24/2019 | 9/24/2019 | 9/24/2019 | P | FAIL |
Josh Bogle
|
|
|
needs engineering for gravity and lateral
|
Routing Walk-In (BLD) | 7/17/2019 | 7/17/2019 | 7/17/2019 | P | FAIL |
Josh Bogle
|
|
|
bringing corrections that were reqested by Reviewer
|
Routing Walk-In (Zoning) | 7/5/2019 | 7/5/2019 | 7/5/2019 | P | PASS |
Ethan Mansfield
|
|
|
|
Routing Walk-In (BLD) | 7/5/2019 | 7/5/2019 | 7/5/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/5/2019 | | 7/5/2019 | | FAIL |
Josh Bogle
|
|
|
plans lack needed detail
|
1st review completed | | | 7/5/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 7/5/2019 | | | |
|
|
|
|