Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-02496
StatusFinaled
Name CALEB BUILDERS INC
Site Address 5866 E WOODCROSS DR
Project NameKruth Deck Repair
Customer Number 
ePlanReviewYes
Description
Permit to replace existing exterior decking, keeping some original framing, adding new joists as needed. All work per plans & local code. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/30/201912/31/201912/31/2019PPASS
DetailsBrandon Shaw
The project is completed. Please call Michael with any questions ###-#### Inspection requested via web by Michael Kuhn
DOC - Permit Finaled12/31/201912/31/201912/31/2019PPASS
DetailsBrandon Shaw
BLD-Framing/Rough-in7/25/20197/26/20197/26/2019PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Michael Kuhn
Plan assigned to (JAB) Josh7/10/20197/10/20197/15/2019 PASS
DetailsJosh Bogle
07/16 deck, ePlan - 1st done
Routing - PLAN CHECK7/15/2019 7/15/2019 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  7/15/2019 DONE
DetailsJosh Bogle
ESC no - Energy no
Permit Ready to Issue  7/15/2019 DONE
met
Issue PAID IN FULL permit  7/15/2019 DONE
emailed OFFICE@TVBUILDING.COM to sign and send back
1st review completed  7/11/2019 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK7/10/2019 7/11/2019 FAIL
DetailsJosh Bogle
plan lacks a Section view and has innadequate ledger and WUI details
Routing Walk-In (Zoning)7/10/20197/10/20197/10/2019PFAIL
DetailsJosh Bogle
no contact with applicant
Routing - PLANNING7/10/2019 7/10/2019 PASS
DetailsSue Cummings
Plans ACCEPTED BY PLAN TECH  7/10/2019 FAIL
1. Drawings must be uploaded as individual sheets.
2. Drawing file names must include the first characters of the discipline name, followed by the sheet number and name. Example: A2.0_Floor Plan
3. Drawing file names must include the first characters of the discipline name, followed by the sheet number and name.
Example: A2.0_Floor Plan
4. Applicant needs to verify RCE, it does not match our records.
Plans ACCEPTED BY PLAN TECH  7/10/2019 DONE
Intake Approval  7/10/2019 PASS
Recd Pcfee & Taken To Pln CK  7/10/2019 DONE
Application received  7/8/2019 DONE
Application submitted via PDS Online on Jul 8 2019 2:14PM