Letter of compliance/Occupancy | | | 7/10/2020 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 7/10/2020 | | DONE |
|
|
|
|
BLD-Final | 3/20/2020 | 3/23/2020 | 3/23/2020 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
DOC - Permit Finaled | 3/23/2020 | 3/23/2020 | 3/23/2020 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Blower Door Test Results | 3/20/2020 | 3/23/2020 | 3/23/2020 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon 3.9
|
BLD-Framing/Rough-in | 1/7/2020 | 1/7/2020 | 1/7/2020 | P | PEND |
Brandon Shaw
|
|
|
Hold downs at- two under first floor landing, and one at first floor bedroom to be installed with proper hardware...
|
BLD-Energy code compliance | 1/2/2020 | 1/3/2020 | 1/3/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD-Framing/Rough-in | 12/27/2019 | 12/30/2019 | 12/30/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD-Framing/Rough-in | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | FAIL |
Brandon Shaw
|
|
|
1st floor only... Hold downs to be as per plans, and installed per manufactures installation instructions...
|
BLD-Wall Bracing | 10/23/2019 | 10/24/2019 | 10/24/2019 | A | PART |
Brandon Shaw
|
|
|
Work in progress... Floor to floor straps and hold downs to be as per plans before framing rough-in...
|
BLD-Foundation | 9/3/2019 | 9/3/2019 | 9/3/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 8/29/2019 | 8/30/2019 | 8/30/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
Issue PAID IN FULL permit | | | 8/14/2019 | | DONE |
|
|
|
emailed bhhdrafting@boisehunterhomes.com to sign the building and ESC permit and send back
|
Inspection Record Card- Bld | | | 8/14/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 8/13/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 7/30/2019 | 7/30/2019 | 8/13/2019 | | DONE |
Rob Patrick
|
|
|
Resubmittal for engineering change
|
Routing - PLAN CHECK | 8/13/2019 | | 8/13/2019 | | PASS |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 8/13/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 7/30/2019 | | DONE |
|
|
|
plan submittal requested by David for engineering change
|
OVERRIDE | | | 7/23/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 7/23/2019 | | DONE |
|
|
|
met
|
Plan assigned to (RDP) | 7/9/2019 | 7/9/2019 | 7/22/2019 | | DONE |
Rob Patrick
|
|
|
07/22 sfd L1 ePlan...07/17 Failed
|
Routing - PLAN CHECK | 7/22/2019 | | 7/22/2019 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/22/2019 | | DONE |
Rob Patrick
|
|
|
|
Meeting | | | 7/22/2019 | | DONE |
|
|
|
met-**WAITING ON REVIEWER** sent email to Rob for the square footage of the home to be check on the scope of work because it does not add up correctly but he was not available need to wait for the next day to complete the batch stamp.
|
Routing - PLAN CHECK | 7/9/2019 | | 7/17/2019 | | FAIL |
Rob Patrick
|
|
|
|
1st review completed | | | 7/17/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections req'd
|
Route to Impact Fee Review | 7/9/2019 | 7/12/2019 | 7/10/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 7/9/2019 | | 7/10/2019 | | PASS |
Troy James
|
|
|
|
Application received | | | 7/9/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 9 2019 9:42AM
|
Intake Approval | | | 7/9/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/9/2019 | | DONE |
|
|
|
|
Routing - PLANNING | 7/9/2019 | | 7/9/2019 | | PASS |
Brent Moore
|
|
|
|
Routing - Addressing | 7/9/2019 | | 7/9/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 7/9/2019 | | 7/9/2019 | | PASS |
Morgan Webb
|
|
|
|