BLD-Aging Inspection | 6/10/2020 | 6/10/2020 | 6/10/2020 | | DEFR |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 6/9/2020 | 6/9/2020 | 6/10/2020 | | DEFR |
Brandon Shaw
|
|
|
|
DOC - Permit Expired | 6/10/2020 | 6/10/2020 | 6/10/2020 | P | DEFR |
Brandon Shaw
|
|
|
|
Issue PAID IN FULL permit | | | 7/26/2019 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 7/17/2019 | 7/17/2019 | 7/22/2019 | | PASS |
Josh Bogle
|
|
|
07/23 PV, ePlan
|
Routing - PLAN CHECK | 7/17/2019 | | 7/22/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 7/22/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/22/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 7/22/2019 | | DONE |
|
|
|
met
|
Routing - PLANNING | 7/17/2019 | | 7/17/2019 | | PASS |
Sue Cummings
|
|
|
|
Intake Approval | | | 7/17/2019 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/17/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/17/2019 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/10/2019 | | FAIL |
|
|
|
1. All drawings in the drawing folder must be uploaded as individual sheets- Ref. to drawing name- Park lain Park line (1).pdf
|
Application received | | | 7/9/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 9 2019 9:54AM
|