BLD-Final | 1/2/2020 | 1/3/2020 | 1/3/2020 | A | PASS |
Mike Jordan
|
|
|
REI opens at 10:00am. Phone #: ###-#### Inspection requested via web by Layton Anderson
|
DOC - Permit Finaled | 1/3/2020 | 1/3/2020 | 1/3/2020 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 1/3/2020 | 1/3/2020 | 1/3/2020 | A | PASS |
Mike Jordan
|
|
|
REI opens at 10:00am. Phone #: ###-#### Inspection requested via web by Layton Anderson
|
BLD-Final | 1/2/2020 | 1/2/2020 | 1/2/2020 | P | NR |
Mike Jordan
|
|
|
call ahead Layton Phone #: ###-####. Needs tp provide the small docs.
|
FIRE-Final Inspection | 1/2/2020 | 1/2/2020 | 1/2/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
The store REI opens at 10:00 am. Phone #: ###-#### Inspection requested via web by Layton Anderson
|
FIRE-Final Inspection | 12/30/2019 | 12/31/2019 | 12/31/2019 | A | CANC |
Jim Page
|
|
|
Phone #: ###-#### >> Inspection requested via web by Layton Anderson Inspection cancelled from web by: Layton Anderson
|
Issue PAID IN FULL permit | | | 12/23/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/23/2019 | | DONE |
|
|
|
|
Expiration Notice | 12/6/2019 | 12/30/2019 | 12/6/2019 | | DONE |
Brittany Hill
|
|
|
|
Routing - FIRE | 8/6/2019 | 8/6/2019 | 8/8/2019 | | PASS |
Mark Scharfen
|
|
|
08.08.2019-Completed fire review, uploaded rev_fire 08.08.2019.pdf
|
Plan assigned to (JHB) | 7/19/2019 | 7/19/2019 | 8/8/2019 | | PASS |
Joe Bruce
|
|
|
(1st Rev Comp) 07/30 (L2) REI Hanging Rack, ePlan
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/8/2019 | | DONE |
|
|
|
all met
Need
GC Form
Revised Cert of value
|
Routing - PLAN CHECK | 8/6/2019 | | 8/8/2019 | | PASS |
Joe Bruce
|
|
|
|
Plan resubmittals received | | | 8/1/2019 | | FAIL |
Joe Bruce
|
|
|
Plan sheets A4.0 that was resubmitted does not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block.
|
Route to Impact Fee Review | 7/31/2019 | 8/3/2019 | 7/31/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 7/19/2019 | 7/19/2019 | 7/31/2019 | | FAIL |
Mark Scharfen
|
|
|
07.31.2019-Completed fire review. Uploaded rev_fire 07.31.2019.pdf and emailed architect.
|
1st review completed | | | 7/31/2019 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 7/31/2019 | | DONE |
Joe Bruce
|
|
|
Fire Plan Review requires a resubmittal.
|
Routing - PLAN CHECK | 7/19/2019 | | 7/30/2019 | | PASS |
Joe Bruce
|
|
|
|
Intake Approval | | | 7/17/2019 | | PASS |
Joe Bruce
|
|
|
Prescreen approved by JHB.
|
Intake Approval | | | 7/12/2019 | | FAIL |
Joe Bruce
|
|
|
Plan sheets S1.1 and S2.1 do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” (4"x4" on cover) space located 3” off the right sheet edge to allow for the title block. Verify ALL plan sheets have the required space for city approval stamp.
Please refer to this document for our submittal standards: https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
|
Application received | | | 7/9/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 9 2019 5:19PM
|