BLD-Final | 8/14/2019 | 8/15/2019 | 8/15/2019 | A | PASS |
Tell Riley
|
|
|
garage has been removed//electrical temp has been finaled//new permit for an addition to the house is currently under review//
|
DOC - Permit Finaled | 8/15/2019 | 8/15/2019 | 8/15/2019 | P | PASS |
Tell Riley
|
|
|
|
Permit Ready to Issue | | | 7/11/2019 | | DONE |
|
|
|
need letter from parcel owner with the GC form signed by the parcel owner
|
Telephone call | | | 7/11/2019 | | DONE |
|
|
|
called Sarah to let know permit is ready and how much is owed-told her she needs a letter from the parcel owner and the GC from the parcel owner
|
Issue PAID IN FULL permit | | | 7/11/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/10/2019 | | 7/10/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 7/10/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/10/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/10/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/10/2019 | | DONE |
Josh Bogle
|
|
|
ESc no - Energy no
|
Application received | | 7/10/2019 | | | |
|
|
|
|