Letter of compliance/Occupancy | | | 4/2/2020 | | DONE |
|
|
|
|
BLD-Final | 3/20/2020 | 3/20/2020 | 3/20/2020 | P | PASS |
Dave Hannah
|
|
|
Chrisitna Wellman can you please call about 45 minutes before heading to this location? Thank you Phone #: ###-#### Inspection requested via web by Christina Wellman
|
DOC - Permit Finaled | 3/20/2020 | 3/20/2020 | 3/20/2020 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 3/18/2020 | 3/19/2020 | 3/19/2020 | A | NR |
Mike Jordan
|
|
|
Needs public works final.
|
CHANGE STATUS TO (ISS) | | | 3/18/2020 | | DONE |
|
|
|
Finaled in error
|
BLD-Energy code compliance | 12/22/2019 | 12/23/2019 | 12/23/2019 | A | PASS |
Brandon Shaw
|
|
|
Christina Wellman The garage code is 0880 enter. Merry Christmas Phone #: ###-#### Inspection requested via web by Christina Wellman
|
DOC - Permit Finaled | 12/23/2019 | 12/23/2019 | 12/23/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 12/19/2019 | 12/20/2019 | 12/20/2019 | A | PASS |
Brandon Shaw
|
|
|
Christina Wellman
Please give me a call when you are about 40 minutes before you head to the house. Thank you Phone #: ###-#### Inspection requested via web by Christina Wellman
|
Routing - MECHANICAL | 12/9/2019 | | 12/9/2019 | | PASS |
Troy James
|
|
|
New manual j report
|
BLD-Wall Bracing | 10/15/2019 | 10/15/2019 | 10/15/2019 | P | PASS |
Brandon Shaw
|
|
|
OK to cover exterior...
|
BLD-Conference | 10/14/2019 | 10/14/2019 | 10/15/2019 | A | CANC |
Brandon Shaw
|
|
|
|
BLD-Footing | 9/26/2019 | 9/26/2019 | 9/26/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress... Mono pour...
|
PubWorks Subgrade Approval | 9/24/2019 | 9/24/2019 | 9/24/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 9/5/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/5/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 9/4/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 7/19/2019 | 7/19/2019 | 9/4/2019 | | PASS |
Josh Bogle
|
|
|
07/25 addition, ePlan - 1st done
|
Routing - PLAN CHECK | 8/28/2019 | | 9/4/2019 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/4/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 9/4/2019 | | DONE |
|
|
|
Need
RP
|
Routing - MECHANICAL | 8/30/2019 | | 8/30/2019 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 8/28/2019 | | 8/29/2019 | | FAIL |
Troy James
|
|
|
Emailed corrections to designer
|
Plan Reviewer's activity | | | 8/28/2019 | | DONE |
Josh Bogle
|
|
|
accepted and routed resubmittal
|
Routing - PLAN CHECK | 8/26/2019 | | 8/26/2019 | | FAIL |
Josh Bogle
|
|
|
still needs man j
|
Routing - Erosion and Sediment | 8/23/2019 | | 8/23/2019 | | PASS |
Michael Zawacki
|
|
|
|
Routing - PLAN CHECK | 8/14/2019 | | 8/14/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - Erosion and Sediment | 8/9/2019 | | 8/9/2019 | | FAIL |
Michael Zawacki
|
|
|
Please submit ESC waiver
|
1st review completed | | | 7/29/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/19/2019 | | 7/29/2019 | | FAIL |
Josh Bogle
|
|
|
no Man j - no WUI call-outs
|
Routing PW Grading-Hillside | 7/19/2019 | | 7/22/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing - FIRE | 7/19/2019 | 7/19/2019 | 7/19/2019 | | CANC |
Lee G Meredith
|
|
|
Review not required
|
Routing - PLANNING | 7/19/2019 | | 7/19/2019 | | PASS |
Ethan Mansfield
|
|
|
|
Routing - PUBLIC WORKS | 7/19/2019 | | 7/19/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 7/19/2019 | | 7/19/2019 | | FAIL |
Michael Zawacki
|
|
|
Please provide ESC narrative or waiver leter
https://www.cityofboise.org/departments/planning-and-development-services/building/erosion-and-sediment-control/erosion-and-sediment-control-documents/
|
Plans ACCEPTED BY PLAN TECH | | | 7/19/2019 | | DONE |
|
|
|
|
Intake Approval | | | 7/19/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/19/2019 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/12/2019 | | FAIL |
|
|
|
1. Plans must be uploaded as individual sheets.
2. All plans must be uploaded in “Landscape” format in the horizontal position.
3. Drawing file names must include the first characters of the discipline name, followed by the sheet number and name. Example: A2.0_Floor Plan
|
Application received | | | 7/10/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 10 2019 4:04PM
|