Permit Information
Permit NumberBLD19-02544
StatusFinaled
Name HC COMPANY INC
Site Address 12585 W EXPLORER DR Unit: 100
Project NameEnel X - Suite #100
Customer Number 
ePlanReviewYes
Description
(ENEL X – SUITE #100) Permit is to remodel an existing 2,519 sq. ft. business space. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select door/door frames, removal of select millwork, removal of select column furring, select new millwork, new floor covering, construction of select interior wall infill, new light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/13/20199/16/20199/16/2019APASS
DetailsTell Riley
John Phone #: ###-####//final complete//add door signage//
Print Occupancy Form  9/16/2019 DONE
Permanent Occupancy  9/16/2019 DONE
FIRE-Final Inspection9/13/20199/13/20199/13/2019PPASS
DetailsJim Page
Previously noted items have been corrected. No fire sprinkler modifications, no fire alarm modifications, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work complete, signature provided on sign off card for associated trades.

John Phone #: ###-####
FIRE-Final Inspection9/12/20199/12/20199/12/2019PFAIL
DetailsJim Page
Provide emergency lighting for exterior landing discharge per IFC 1008.3.2. Provide fire exitnguisher with a current inspection tag.

John Phone #: ###-####
BLD-Framing/Rough-in8/6/20198/7/20198/7/2019APASS
DetailsTell Riley
John Phone #: ###-####//framing ok per plans//one doorway framed in//
Issue PAID IN FULL permit  7/22/2019 DONE
emailed permits to be signed to- jthomas@hcco-inc.com
Print Occupancy Form  7/22/2019 DONE
Route to Impact Fee Review7/18/20197/21/20197/19/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan assigned to (JG)7/16/20197/16/20197/18/2019 PASS
DetailsJavier Guzman
07/19 L1 Enel X Office Alterations ePlan
Routing - PLAN CHECK7/16/2019 7/18/2019 PASS
DetailsJavier Guzman
1st review completed  7/18/2019 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  7/18/2019 DONE
Permit Ready to Issue  7/18/2019 DONE
all met: jthomas@hcco-inc.com

Need GC
Need Rev Val
Routing - Addressing7/16/2019 7/16/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS7/16/2019 7/16/2019 PASS
DetailsMorgan Webb
Intake Approval  7/15/2019 PASS
DetailsJavier Guzman
Application received  7/11/2019 DONE
Application submitted via PDS Online on Jul 11 2019 6:33AM