BLD-Final | 8/22/2019 | 8/23/2019 | 8/23/2019 | A | PASS |
Tony Young
|
|
|
Jason Phone #: ###-####
|
Permanent Occupancy | | | 8/23/2019 | | DONE |
|
|
|
|
FIRE-Final Inspection | 8/22/2019 | 8/22/2019 | 8/22/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, storage has been lowered and is now code compliant. No fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags. Final life fire safety inspection complete.
Jason Phone #: ###-####
|
BLD-Final | 8/2/2019 | 8/5/2019 | 8/5/2019 | P | NR |
Tony Young
|
|
|
Jason Phone #: ###-####,, needs fire/life safety 1st
|
FIRE-Final Inspection | 8/2/2019 | 8/5/2019 | 8/5/2019 | A | FAIL |
Jim Page
|
|
|
Racking permit is required if storage racks stay the same height, current top shelf exceeds 8 feet and storage exceeds 12 feet, racking cannot exceed 8 feet without a racking permit. Provide sticker at main entrance reading "Door to remian unlocked while building is occupied".
Jason Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/2/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/15/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/15/2019 | | DONE |
|
|
|
met
|
Telephone call | | | 7/15/2019 | | DONE |
|
|
|
Tired to call Jason Myers and it said the call can not be completed at this time and to call back later.
|
Plan assigned to (BJM) | 7/11/2019 | 7/11/2019 | 7/12/2019 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 7/12/2019 | | 7/12/2019 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 7/12/2019 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 7/12/2019 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/12/2019 | | DONE |
Brian McGowan
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/11/2019 | | DONE |
|
|
|
|
Intake Approval | | | 7/11/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/11/2019 | | DONE |
|
|
|
|
First Notice | | 9/2/2019 | | | |
|
|
|
|
Application received | | 7/11/2019 | | | |
|
|
|
|