Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-02555
StatusFinaled
Name CBH HOMES
Site Address 5999 S STURGEON WAY
Project NameLOT 04 BLK 01 FORK SOUTH SUB
Customer Number 
ePlanReviewYes
Description
**PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2054 sq. ft., one story single family dwelling with 3 bedrooms, 2 bathrooms, approximately 40 sq. ft. of covered patio/porch and a 669 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/3/20201/3/20201/3/2020APASS
DetailsMike Jordan
garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle
DOC - Permit Finaled1/3/20201/3/20201/3/2020PPASS
DetailsMike Jordan
BLD-Blower Door Test Results1/3/20201/3/20201/3/2020ADONE
DetailsMike Jordan
3.7
BLD-Energy code compliance11/14/201911/15/201911/15/2019APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in11/14/201911/15/201911/15/2019APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Footing11/14/201911/15/201911/14/2019ACANC
DetailsMike Jordan
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Energy code compliance11/14/201911/14/201911/14/2019PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Joel Hirtle Inspection cancelled from web by: Joel Hirtle
BLD-Framing/Rough-in11/14/201911/14/201911/14/2019PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Joel Hirtle Inspection cancelled from web by: Joel Hirtle
BLD-Footing11/14/201911/14/201911/14/2019PCANC
DetailsMike Jordan
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru Inspection cancelled via mobile web on Thursday, November 14, 2019.
BLD-Framing/Rough-in11/12/201911/13/201911/13/2019PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Complete lateral bracing on C1, C2 and B2 trusses. Provide strong back on gable end in garage and north side gable. Roll block trusses at shear locations. Fireblock missed areas at 2x4 double next to master bedroom at top plates. install purlins on B trusses top chord were roof sheathing has been omitted. Ok to insulate. Correction notice posted.
BLD-Framing/Rough-in11/11/201911/12/201911/12/2019PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Airseal not completed.
BLD-Wall Bracing10/31/201911/1/201911/1/2019APASS
DetailsMike Jordan
Billy Phone #: ###-####
BLD-Foundation10/8/201910/9/201910/9/2019PFAIL
DetailsBrandon Shaw
Poured before inspection...
Proceed at own risk...
BLD-Foundation10/7/201910/8/201910/8/2019PNR
DetailsBrandon Shaw
foundation wall // Dane Phone #: ###-####
BLD-Footing10/4/201910/7/201910/7/2019PPASS
DetailsJim Storey
Jerry Phone #: ###-####
Routing - MECHANICAL9/25/2019 9/25/2019 PASS
DetailsTroy James
New manual j report
Plan Modification Accepted  9/24/2019 DONE
start plan mod-manual j workflow per Gloria at CBH
Issue PAID IN FULL permit  9/17/2019 DONE
Inspection Record Card- Bld  9/17/2019 DONE
OVERRIDE  7/16/2019  
Plan assigned to (J_N)7/12/20197/12/20197/16/2019 DONE
DetailsJenny Nelson
Routing - PLAN CHECK7/12/2019 7/16/2019 PASS
DetailsJenny Nelson
1st review completed  7/16/2019 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  7/16/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  7/16/2019 DONE
Route to Impact Fee Review7/12/20197/15/20197/15/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL7/12/2019 7/15/2019 PASS
DetailsChad Schwendiman
Routing - PLANNING7/12/2019 7/12/2019 PASS
DetailsSue Cummings
Routing - Addressing7/12/2019 7/12/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS7/12/2019 7/12/2019 PASS
DetailsAngela Hardy
Plans ACCEPTED BY PLAN TECH  7/12/2019 DONE
Recd Pcfee & Taken To Pln CK  7/12/2019 DONE
Intake Approval  7/12/2019 PASS
Application received  7/11/2019 DONE
Application submitted via PDS Online on Jul 11 2019 1:10PM