BLD-Final | 5/12/2020 | 5/13/2020 | 5/13/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 5/13/2020 | 5/13/2020 | 5/13/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 5/13/2020 | 5/13/2020 | 5/13/2020 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 3.96
|
PubWorks Occupancy Approval | 5/13/2020 | 5/13/2020 | 5/13/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Photos of the landscaping and a video of the drainage connection has been received by Public Works Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 5/4/2020 | 5/5/2020 | 5/5/2020 | A | NR |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Energy code compliance | 2/3/2020 | 2/3/2020 | 2/3/2020 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Framing/Rough-in | 1/28/2020 | 1/28/2020 | 1/28/2020 | P | PART |
Bob Archibald
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick. Ok for insulation, all trades appoved roughins.
|
BLD-Framing/Rough-in | 1/24/2020 | 1/27/2020 | 1/27/2020 | A | FAIL |
Brandon Shaw
|
|
|
No city approved plans on site...
|
BLD-Other | 11/20/2019 | 11/21/2019 | 11/21/2019 | A | PASS |
Brandon Shaw
|
|
|
Soffitt Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Wall Bracing | 10/17/2019 | 10/17/2019 | 10/17/2019 | P | PART |
Brandon Shaw
|
|
|
First floor only...
|
BLD-Foundation | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | PASS |
Brandon Shaw
|
|
|
2pm if possible Phone #: ###-#### Inspection requested via web by Kyle Seick
|
PubWorks Subgrade Approval | 9/12/2019 | 9/12/2019 | 9/12/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 8/30/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/30/2019 | | DONE |
|
|
|
|
Meeting | | | 8/30/2019 | | DONE |
|
|
|
Contacted HHS Construction to inform them the sewer fees were missed and that once those fees have been paid this project can be issued.
|
CHANGE STATUS TO (RDY) | | | 8/30/2019 | | DONE |
|
|
|
sewer fees were missed did not mean to issue
|
CHANGE STATUS TO (ISS) | | | 8/30/2019 | | DONE |
|
|
|
sewer fees have been paid
|
OVERRIDE | | | 8/22/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 7/16/2019 | 7/16/2019 | 8/22/2019 | | DONE |
Jenny Nelson
|
|
|
08/02 sfd L2 ePlan, 1st complete, waiting for hillside, egress window size
|
Routing PW Grading-Hillside | 8/22/2019 | | 8/22/2019 | | FAIL |
Melissa Jannusch
|
|
|
see changemarks in ePlan.
|
Routing - PLAN CHECK | 8/22/2019 | | 8/22/2019 | | PASS |
Jenny Nelson
|
|
|
|
Routing PW Grading-Hillside | 8/22/2019 | | 8/22/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/22/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 8/22/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/13/2019 | | 8/13/2019 | | FAIL |
Jenny Nelson
|
|
|
No corrections made
|
1st review completed | | | 8/1/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing PW Grading-Hillside | 7/16/2019 | | 8/1/2019 | | FAIL |
Melissa Jannusch
|
|
|
Final subdivision as-builts and post construction reports needed prior to approval/ acceptance for building permit review --MMJ ###-####
|
Routing - FIRE | 7/16/2019 | 7/16/2019 | 7/18/2019 | | PASS |
Lee G Meredith
|
|
|
07/29-5997 E Foxgrove Dr. residential hillside ePlan-LGM
Sprinklers are requried.
|
Routing - PLAN CHECK | 7/16/2019 | | 7/18/2019 | | FAIL |
Jenny Nelson
|
|
|
egress window size
|
Route to Impact Fee Review | 7/16/2019 | 7/19/2019 | 7/17/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 7/16/2019 | | 7/17/2019 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 7/16/2019 | | 7/17/2019 | | PASS |
Doug Chausow
|
|
|
|
Plan Reviewer's activity | | | 7/17/2019 | | DONE |
|
|
|
Emailed failed fire review comments to Kyle Davis.
|
Routing - Erosion and Sediment | 7/16/2019 | | 7/16/2019 | | PASS |
Michael Zawacki
|
|
|
Foothills lot.
|
Routing - PUBLIC WORKS | 7/16/2019 | | 7/16/2019 | | PASS |
Angela Hardy
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/16/2019 | | DONE |
|
|
|
|
Intake Approval | | | 7/16/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/16/2019 | | DONE |
|
|
|
|
Routing - PLANNING | 7/16/2019 | | 7/16/2019 | | PASS |
Sue Cummings
|
|
|
|
Application received | | | 7/12/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 12 2019 8:06AM
|