Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-02586
StatusFinaled
Name CM COMPANY
Site Address 2501 N BOGUS BASIN RD
Project NameHealthwise Stair Replacement
Customer Number 
ePlanReviewYes
Description
(HEALTHWISE - STAIR REPLACEMENT) HILLSIDE = YES Special inspections are required, see #310 form for details. Permit to replace an existing concrete stairway with a pre-cast concrete stairway. Existing guardrail and handrail to be reinstalled. Structural engineering has been provided. MDH A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice12/24/201912/24/201912/30/2019 DONE
DetailsTony Young
mailed 1-1-20
BLD-Final12/19/201912/24/201912/24/2019PPASS
DetailsTony Young
Final inspection request for new precast stairs installed on exiting columns. Phone #: ###-#### Inspection requested via web by Brian Hetmer// received special inspection report via e-mail
DOC - Permit Finaled12/24/201912/24/201912/24/2019PPASS
DetailsTony Young
BLD-Final12/18/201912/19/201912/19/2019APEND
DetailsTony Young
Final inspection request for new precast stairs installed on exiting columns. Phone #: ###-#### Inspection requested via web by Brian Hetmer
BLD-Final12/17/201912/18/201912/18/2019PPEND
DetailsTony Young
Final inspection request for new precast stairs installed on exiting columns. Phone #: ###-#### Inspection requested via web by Brian Hetmer// pending letter
BLD-Final12/16/201912/17/201912/17/2019PPEND
DetailsTony Young
Final inspection request for new precast stairs installed on exiting columns. Phone #: ###-#### Inspection requested via web by Brian Hetmer// all ok,, just pending the letter from the special inspections
FIRE-Final Inspection12/16/201912/17/201912/17/2019APASS
DetailsJim Page
Final life fire safety inspection for scope of work is complete.

Final inspection request for new precast stairs installed on exiting columns. Phone #: ###-#### Inspection requested via web by Brian Hetmer
BLD-Final12/13/201912/16/201912/16/2019PPART
DetailsTony Young
Final inspection request for new precast stairs installed on exiting columns. Phone #: ###-#### Inspection requested via web by Brian Hetmer// ok pending f/l/s and final letter from the engineer
Issue PAID IN FULL permit  12/11/2019 DONE
Inspection Record Card- Bld  12/11/2019 DONE
Expiration Notice12/6/201912/30/201912/6/2019 DONE
DetailsBrittany Hill
OVERRIDE  9/10/2019  
Routing - FIRE7/31/20198/2/20199/10/2019 PASS
DetailsMark Scharfen
09/10 - 502 Healthwise Stair Replacement. Exterior pre-cast stair. No report needed. Approved.
1st review completed  9/10/2019 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  9/10/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  9/10/2019 DONE
ALL MET Need GC
Need rev cert of val
Need RP-met
Plan assigned to (M_H)7/31/2019 9/10/2019 DONE
DetailsMichael Hanson
09/10 #502 L3 ePlan - Healthwise Stair Replacement - Pending fire review
Routing - PLAN CHECK7/31/2019 9/6/2019 PASS
DetailsMichael Hanson
Routing PW Grading-Hillside8/2/2019 8/19/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####


Routing Off Site - STRUCTURAL8/2/2019 8/16/2019 PASS
DetailsMichael Hanson
Passed in ePlan per Dave Haugland @ AHJ engineering.
Routing - Design Review8/2/2019 8/6/2019 PASS
DetailsJosh Wilson
No DR req'd.
Routing - Erosion and Sediment8/2/2019 8/6/2019 PASS
DetailsMichael Zawacki
Waiver approved.
Routing - PLANNING8/2/2019 8/5/2019 PASS
DetailsBrent Moore
Routing - Addressing8/2/2019 8/5/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS8/2/2019 8/2/2019 PASS
DetailsAngela Hardy
Intake Approval  7/31/2019  
DetailsBrian McGowan
Intake Approval  7/24/2019 FAIL
DetailsBrian McGowan
Please provide the following for your Prescreen to be approved:
1. A completed Form #310.
2. Complete the Responsible Person Information on Form #701.
3. Engineering calculations need to be provided.
4. Provide Soils and Geotech Report if calculations are not set at default.
5. Provide Planning and Zoning Approval letter.
6. Please provide the Code Analysis for Boise City and the Building Data for the building you are attaching the stairs to.
Application received  7/12/2019 DONE
Application submitted via PDS Online on Jul 12 2019 11:03AM