Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-02594
StatusIssued
Name MORENO PAULINO
Site Address 6700 W USTICK RD
Project Name 
Customer Number 
ePlanReviewNo
Description
MODIFICATION - ADDING A COVER OVER THE STAIRS **jab** Permit for a remodel, to include: excavation for a concrete stair to basement; footing and foundation and concrete steps to attach to existing foundation. Existing egress window to be sawcut for the installation of a new egress door. No railing or stair cover to be added at this time.- All work per plans, notes, engineering, & local code. Separate electrical permit required. **RDP**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/1/201910/2/201910/2/2019AFAIL
DetailsTell Riley
jose Phone #: ###-####//correction notice issued for steel cable railing and steel post supports//door also needs sealed and finished//electrical permit and inspection required for add light fixtures//
BLD-Framing/Rough-in9/11/20199/12/20199/12/2019APASS
DetailsDave Hannah
Jose Phone #: ###-####-wants to make sure the roof sheathing is inspected as well
Routing Walk-In (Zoning)8/21/20198/21/20198/21/2019PPASS
DetailsJeff Lowe
plan mod for canopy to stairway
Routing Walk-In (BLD)8/21/20198/21/20198/21/2019PDONE
DetailsJosh Bogle
Routing - PLAN CHECK8/21/2019 8/21/2019 PASS
DetailsJosh Bogle
Case Summary (BLD)  8/21/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  8/21/2019 DONE
DetailsJosh Bogle
Permit Ready to Issue  8/21/2019 DONE
CHANGE STATUS TO (ISS)  8/21/2019 DONE
Plan Modification Accepted  8/21/2019 DONE
plan mod to add canopy to stair way
BLD-Foundation8/6/20198/6/20198/6/2019APASS
DetailsTell Riley
BLD-Wall Bracing8/5/20198/6/20198/6/2019ACANC
DetailsTell Riley
Jose Phone #: ###-####
BLD-Footing7/31/20198/1/20198/1/2019APASS
DetailsTell Riley
Jose Phone #: ###-####//corrections made//ok per plans//
BLD-Footing7/30/20197/30/20197/30/2019PFAIL
DetailsTell Riley
Jose Phone #: ###-####//add Z bars at footing stepdowns per plans//keep plans onsite//
Routing Walk-In (Zoning)7/12/20197/12/20197/12/2019PPASS
DetailsStephanie Leonard
Stairs comply with required side setback.
Routing Walk-In (BLD)7/12/20197/12/20197/12/2019PDONE
DetailsRob Patrick
Plan assigned to (RDP)7/12/20197/12/20197/12/2019 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  7/12/2019 DONE
DetailsRob Patrick
Permit Ready to Issue  7/12/2019 DONE
Issue PAID IN FULL permit  7/12/2019 DONE
Routing - PLAN CHECK7/12/2019 7/12/2019 PASS
DetailsRob Patrick
1st review completed  7/12/2019 DONE
DetailsRob Patrick
Inspection Record Card- Bld  7/12/2019 DONE
DetailsRob Patrick
Case Summary (BLD)  7/12/2019 DONE
DetailsRob Patrick
Application received 7/12/2019