Permit Information
Permit NumberBLD19-02603
StatusFinaled
Name RADIX CONSTRUCTION INC
Site Address 7100 W STATE ST
Project NameU.S. Bank
Customer Number 
ePlanReviewYes
Description
(US BANK) Permit is to remodel approx. 350 sq. ft. within an existing Albertson’s grocery store. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of select millwork, removal of select acoustic suspended ceiling, removal of select gypsum soffit, construction of interior non-bearing walls to create an office, a BOH area, and open banking area, select new door/door frames, select new interior storefront, millwork, new select suspended acoustic ceiling, electrical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Fire sprinklers used for building area increase. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  1/22/2020 DONE
SECOND PAST DUE NOTICE
Print Statement  1/8/2020 DONE
Print Statement  12/11/2019 DONE
BLD-Final10/31/201911/1/201911/1/2019APASS
DetailsTony Young
Dave Phone #: ###-####
Permanent Occupancy  11/1/2019 DONE
FIRE-Final Inspection10/18/201910/21/201910/21/2019APASS
DetailsTroy Cobbley
Life safety passed. The building inspector is going to verify the door hardware on the office.

Dave Phone #: ###-####
FIRE-Final Inspection10/16/201910/17/201910/17/2019PFAIL
DetailsTroy Cobbley
*** FAIL No ceiling tiles installed. Fire sprinklers not installed in tiles. Duct wrap needs repaired in 2 places where sitting on grid. MAS***
Dave Phone #: ###-####
BLD-Framing/Rough-in10/14/201910/15/201910/15/2019APASS
DetailsTony Young
Dave Phone #: ###-####,, grid ok
Print Occupancy Form  9/9/2019 DONE
Issue PAID IN FULL permit  9/9/2019 DONE
Route to Impact Fee Review8/29/20199/1/20198/29/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Plan assigned to (JG)8/23/20198/23/20198/29/2019 PASS
DetailsJavier Guzman
08/28 L1 >U.S Bank albertsons ePlan*
Routing - PLAN CHECK8/23/2019 8/29/2019 PASS
DetailsJavier Guzman
1st review completed  8/29/2019 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  8/29/2019 DONE
Permit Ready to Issue  8/29/2019 DONE
MET CHRISL@RADIXCONTRUCTION.COM
Need GC Form and Revised Value
Routing - Addressing8/23/2019 8/23/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS8/23/2019 8/23/2019 PASS
DetailsMorgan Webb
NO NEW PLUMBING
Routing - Design Review8/23/2019 8/23/2019 PASS
DetailsKayCee Babb
No exterior alterations are proposed. No additioanl Design Review is required***Sent to DR because it seems like exterior wall is being infilled but Brian McGowen spoke with applicant and they said it is not the exterior wall
Intake Approval  8/22/2019 PASS
DetailsJavier Guzman
Intake Approval  8/14/2019 FAIL
DetailsBrian McGowan
Please provide the following in order for your Prescreen to be approved:
1. Every Plan Sheet must provide an area in the bottom right hand corner for the City Approved Stamp. See requirements with uploading Documents in ePlan.
2. Provide a completed form 304.
3. Show Exit and emergency lighting for the Tenant Space.
4. Please provide a more clarifying Key Plan. It appears you may be modifying the exterior of the building. If so, Planning and Zoning approval letters are required as well as further details, sections etc.
Intake Approval  7/16/2019 FAIL
DetailsBrian McGowan
Please provide the following in order for your Prescreen to be approved:
1. Provide a completed Submittal Checklist and all forms, documents and drawings as required.
2. Every Plan Sheet must provide an area in the bottom right hand corner for the City Approved Stamp. See requirements with uploading Documents in ePlan.
Application received  7/15/2019 DONE
Application submitted via PDS Online on Jul 15 2019 9:51AM