Third Notice | | 7/14/2020 | 8/11/2020 | | DONE |
|
|
|
mailed 8-11-2020
|
Second Notice | | 5/17/2020 | 7/9/2020 | | DONE |
|
|
|
mailed 7-9-2020
|
First Notice | | 4/10/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020
|
BLD-Final | 4/6/2020 | 4/6/2020 | 4/6/2020 | A | DONE |
Bob Archibald
|
|
|
For final occupancy signature. Ok for perm. Occ.
|
BLD-Aging Inspection | 3/25/2020 | 3/25/2020 | 4/2/2020 | | PEND |
Tony Young
|
|
|
|
Permanent Occupancy | | | 3/31/2020 | | DONE |
|
|
|
Reprint with Special Conditions taken off
|
Permanent Occupancy | | | 3/31/2020 | | DONE |
|
|
|
|
Zoning Approval | 3/30/2020 | 3/30/2020 | 3/30/2020 | | PASS |
Katelyn Menuge
|
|
|
|
Telephone call | | | 3/30/2020 | | DONE |
|
|
|
emailed contractor informing them they have passed all inspections required for CO. Requested they email me their inspection card so I can issue.
|
Telephone call | | | 3/26/2020 | | DONE |
|
|
|
emailed GC courtesy reminder. See DOCS
|
Telephone call | | | 3/17/2020 | | DONE |
|
|
|
mailed a courtesy letter and emailed one to the GC letting them know that this permit will expire on 4/14/20 and how to request an extension. See DOCs
|
BLD-Final | 1/14/2020 | 1/15/2020 | 1/15/2020 | P | PASS |
Tony Young
|
|
|
Tony Phone #: ###-####//
|
FIRE-Final Inspection | 1/14/2020 | 1/15/2020 | 1/15/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Contractor to remove thumbturn dead bolt from main exit, keyed ok prior to the building inspection.
Tony Phone #: ###-####
|
BLD-Conference | 1/13/2020 | 1/14/2020 | 1/15/2020 | P | PART |
Tony Young
|
|
|
Tony Phone #: ###-####// conf on final status// walk through
|
Temporary Occupancy | 1/15/2020 | 4/14/2020 | 1/15/2020 | | DONE |
Gabe Brenner
|
|
|
|
PubWorks Occupancy Approval | 1/15/2020 | 1/15/2020 | 1/15/2020 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval Temp | 1/14/2020 | 1/14/2020 | 1/14/2020 | | PASS |
Katelyn Menuge
|
|
|
Temporary BND20-00009
|
BLD-Final | 1/13/2020 | 1/13/2020 | 1/13/2020 | P | NR |
Tony Young
|
|
|
Tony Phone #: ###-####,, walk through only,, needs trades, etc
|
BLD-Wall Bracing | 12/20/2019 | 12/20/2019 | 12/20/2019 | P | PASS |
Tell Riley
|
|
|
Jose Phone #: ###-####//interior shear walls//
|
BLD-Energy code compliance | 12/19/2019 | 12/20/2019 | 12/20/2019 | A | PASS |
Tell Riley
|
|
|
after 8 am // Tony Phone #: ###-####/tony will call in for interior shear//insulation ok//
|
BLD-Framing/Rough-in | 12/18/2019 | 12/18/2019 | 12/18/2019 | P | PASS |
Tony Young
|
|
|
jose Phone #: ###-####,, ok to insulate,, will also have interior shear later
|
BLD-Wall Bracing | 11/18/2019 | 11/19/2019 | 11/19/2019 | A | PART |
Tony Young
|
|
|
Tony Phone #: ###-####,, exterior ok,, nailing and straps ok,, ok to cover roof,, interior shear later
|
BLD-Footing | 9/25/2019 | 9/26/2019 | 9/26/2019 | A | PASS |
Tony Young
|
|
|
Shawn Phone #: ###-#### pour time 10:30
|
Issue PAID IN FULL permit | | | 9/6/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 9/5/2019 | | |
|
|
|
|
Plan assigned to (JHB) | 7/15/2019 | 7/16/2019 | 9/5/2019 | | PASS |
Joe Bruce
|
|
|
09/02 (2nd Rev) 08/23 - 502 Idaho Tax & Bookkeeping Addition (paper)
|
Print Occupancy Form | | | 9/5/2019 | | DONE |
|
|
|
|
Telephone call | | | 9/5/2019 | | DONE |
|
|
|
Spoke with Ilir to inform him the permit is ready. He informed me a GC will be in to pick up the permit and fill out the 302,306 and give RP.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/5/2019 | | DONE |
Joe Bruce
|
|
|
|
Permit Ready to Issue | | | 9/5/2019 | | DONE |
|
|
|
NEED
RP
MET
GC FORM
REVISED VALUE
|
Routing Off Site - STRUCTURAL | 8/28/2019 | | 9/5/2019 | | PASS |
Joe Bruce
|
|
|
Emailed struc. calcs to Tiffany - AHJ **JHB**
|
Routing - PLAN CHECK | 9/3/2019 | | 9/3/2019 | | PASS |
Joe Bruce
|
|
|
|
Routing - MECHANICAL | 8/28/2019 | | 9/3/2019 | | PASS |
Troy James
|
|
|
|
Routing PW Drainage | 8/28/2019 | | 8/30/2019 | | PASS |
Brian Murphy
|
|
|
|
Plan resubmittals received | | | 8/29/2019 | | DONE |
|
|
|
Three extra copies of plans stamped and taken to plan reviewer.
|
Plan resubmittals received | | | 8/27/2019 | | DONE |
Christina Prado
|
|
|
Received three sets of revised structural calcs, review letter and plan sheets marked A0-1, A1.1, A1.2, A2.2 & M-1; Plans stamped and taken to JHB for review and routing
|
Route to Impact Fee Review | 8/22/2019 | 8/25/2019 | 8/23/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 7/15/2019 | 7/16/2019 | 8/22/2019 | | PASS |
Mark Scharfen
|
|
|
08/23 - 502 Idaho Tax & Bookkeeping Addition (paper). Completed review 08.22. Uploaded rev_fire 08.22.2019.pdf
|
Routing - PLAN CHECK | 7/31/2019 | | 8/22/2019 | | FAIL |
Joe Bruce
|
|
|
Sent plan review report to architect.
|
1st review completed | | | 8/22/2019 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 8/22/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - MECHANICAL | 7/15/2019 | | 7/31/2019 | | FAIL |
Troy James
|
|
|
Need mechanical ventilation design.
|
Routing - PLUMBING | 7/31/2019 | | 7/31/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Erosion and Sediment | 7/15/2019 | | 7/30/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Certfied ESC RP must be listed prior to permit issuance.
|
Routing - PLANNING | 7/15/2019 | | 7/29/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - Design Review | 7/15/2019 | | 7/29/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - PUBLIC WORKS | 7/15/2019 | | 7/25/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing PW Street Lights | 7/23/2019 | | 7/25/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing Off Site - STRUCTURAL | 7/15/2019 | | 7/24/2019 | | FAIL |
Joe Bruce
|
|
|
AHJ - Comments uploaded into Tidemark Documents.
|
Routing PW Sewer Design | 7/19/2019 | | 7/23/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing PW Drainage | 7/16/2019 | | 7/19/2019 | | FAIL |
|
|
|
NEED APDX BJ
|
Telephone call | | | 7/16/2019 | | DONE |
|
|
|
called the courier to puick up drawings for the offsite engineer AHJ Engineering talked Veronica
|
Routing - Addressing | 7/15/2019 | | 7/16/2019 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 7/15/2019 | | PASS |
Brian McGowan
|
|
|
|
Third Notice | | 8/16/2020 | | | |
|
|
|
|
Application received | | 7/15/2019 | | | |
|
|
|
|