Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-02627
StatusIssued
Name ROCK PLACING COMPANY
Site Address 2472 S STARLITE LN
Project NameDeThomas Rock Retaining Wall
Customer Number 
ePlanReviewYes
Description
Permit to build +/-100' of 6' tall rock retaining wall in the location of a failing timber retaining wall. All work per plans, engineering, local codes & ordinances. **JAB**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection6/15/20206/15/20206/17/2020 CANC
DetailsBrandon Shaw
PubWorks Occupancy Approval10/1/201910/1/201910/1/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s design professional indicating that the final wall and soils are acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
OVERRIDE  7/31/2019  
Plan assigned to (JAB) Josh7/17/20197/17/20197/31/2019 PASS
DetailsJosh Bogle
07/23 retaining wall, ePlan - 1st done
Telephone call  7/31/2019 DONE
After receiving notification on ePlan that fees were paid, I sent an email to the contractor letting them know that they need to pay the rest of the ESC fees (waiver fee) and that we need a Responsible Person before we can issue this permit.
Issue PAID IN FULL permit  7/31/2019 DONE
Inspection Record Card- Bld  7/31/2019 DONE
Routing - PLAN CHECK7/31/2019 7/31/2019 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  7/31/2019 DONE
DetailsJosh Bogle
ESC yes - Energy no
Permit Ready to Issue  7/31/2019 DONE
met NEED RP
Routing PW Grading-Hillside7/23/2019 7/23/2019 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Routing - PLAN CHECK7/17/2019 7/22/2019 FAIL
DetailsJosh Bogle
Plan Review postponed pending review of documents requested by Hillside
Routing PW Grading-Hillside7/17/2019 7/22/2019 FAIL
DetailsMelissa Jannusch
See changemark in ePlan and CFH approval letter
1st review completed  7/22/2019 FAIL
DetailsJosh Bogle
CHANGE STATUS TO (REV)  7/22/2019 DONE
changed to review per Josh
Plans ACCEPTED BY PLAN TECH  7/17/2019 DONE
Intake Approval  7/17/2019 PASS
Recd Pcfee & Taken To Pln CK  7/17/2019 DONE
Routing - PLANNING7/17/2019 7/17/2019 PASS
DetailsSue Cummings
Routing - PUBLIC WORKS7/17/2019 7/17/2019 PASS
DetailsAngela Hardy
Routing - Erosion and Sediment7/17/2019 7/17/2019 PASS
DetailsMichael Zawacki
Waiver request approved.
Application received  7/15/2019 DONE
Application submitted via PDS Online on Jul 15 2019 3:01PM