BLD-Final | 3/13/2020 | 3/13/2020 | 3/15/2020 | P | PASS |
Dave Hannah
|
|
|
Rob Phone #: ###-####
|
DOC - Permit Finaled | 3/15/2020 | 3/15/2020 | 3/15/2020 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Wall cover | 11/4/2019 | 11/5/2019 | 11/5/2019 | A | PASS |
Dave Hannah
|
|
|
Rob Phone #: ###-####
|
BLD-Framing/Rough-in | 10/22/2019 | 10/23/2019 | 10/23/2019 | A | PASS |
Dave Hannah
|
|
|
Rob Phone #: ###-####
|
BLD-Footing | 10/1/2019 | 10/2/2019 | 10/2/2019 | A | PASS |
Dave Hannah
|
|
|
Rob Phone #: ###-#### ftgs for back porch
|
BLD-Wall Bracing | 10/1/2019 | 10/1/2019 | 10/1/2019 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 9/30/2019 | 9/30/2019 | 10/1/2019 | P | NR |
Dave Hannah
|
|
|
Rob Phone #: ###-####
|
BLD-Conference | 8/27/2019 | 8/28/2019 | 8/28/2019 | A | PASS |
Dave Hannah
|
|
|
Robert Phone #: ###-#### talked about building a cover over back steps ok but need engineering
|
BLD-Footing | 8/8/2019 | 8/12/2019 | 8/13/2019 | P | PASS |
Dave Hannah
|
|
|
Rob Phone #: ###-####
|
Routing Walk-In (Zoning) | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Ethan Mansfield
|
|
|
Applicant to provide final colors
|
Routing Walk-In (BLD) | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/16/2019 | | 7/16/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 7/16/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/16/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/16/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/16/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Permit Ready to Issue | | | 7/16/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/16/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 7/15/2019 | 7/15/2019 | 7/15/2019 | P | FAIL |
|
|
|
Condition 1.B. of design review app not met.
|
Application received | | 7/15/2019 | | | |
|
|
|
|