BLD-Final | 8/15/2019 | 8/16/2019 | 8/16/2019 | A | PASS |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084299799 >> Inspection requested via mobile web by Dan Weilage
|
DOC - Permit Finaled | 8/16/2019 | 8/16/2019 | 8/16/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Conference | 8/12/2019 | 8/13/2019 | 8/14/2019 | P | DONE |
Brandon Shaw
|
|
|
Need Ele finaled...
|
Routing Walk-In (BLD) | 7/17/2019 | 7/17/2019 | 7/17/2019 | A | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 7/17/2019 | 7/17/2019 | 7/17/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/17/2019 | | 7/17/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/17/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/17/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/17/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 7/17/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/17/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/17/2019 | | 7/17/2019 | | FAIL |
Brian McGowan
|
|
|
Need installation instructions from ICC-ES or Intertek showing the attachments can be done on a metal roof
|
Routing Walk-In (Zoning) | 7/16/2019 | 7/16/2019 | 7/16/2019 | A | PASS |
Ethan Mansfield
|
|
|
|
Routing Walk-In (BLD) | 7/16/2019 | 7/16/2019 | 7/16/2019 | A | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/16/2019 | | 7/16/2019 | | FAIL |
Josh Bogle
|
|
|
needs UL listing for panels & certification for attachement feet
|
1st review completed | | | 7/16/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 7/16/2019 | | | |
|
|
|
|