BLD-Final | 12/18/2019 | 12/19/2019 | 12/19/2019 | A | PASS |
Mike Jordan
|
|
|
Greg Phone #: ###-####
|
DOC - Permit Finaled | 12/19/2019 | 12/19/2019 | 12/19/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 10/24/2019 | 10/25/2019 | 10/25/2019 | A | PASS |
Mike Jordan
|
|
|
Greg Phone #: ###-####. All framing issues resolved.
|
BLD-Framing/Rough-in | 10/23/2019 | 10/23/2019 | 10/23/2019 | P | PASS |
Tell Riley
|
|
|
Tyler Phone #: ###-####//need to add truss bracing and bracing at overbuild 4 ft oc///ok to insulate//
|
Routing - MECHANICAL | 10/18/2019 | | 10/18/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report.
|
Routing - MECHANICAL | 10/9/2019 | | 10/9/2019 | | PASS |
Troy James
|
|
|
Manual j report
|
BLD-Framing/Rough-in | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | CANC |
Mike Jordan
|
|
|
Sam Phone #: ###-####
|
BLD-Wall Bracing | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####
|
BLD-Wall Bracing | 9/24/2019 | 9/25/2019 | 9/25/2019 | A | FAIL |
Mike Jordan
|
|
|
Greg - Sheer wall insp Phone #: ###-####. Noted several areas missing fasteners. Correction notice posted.
|
BLD-Foundation | 8/21/2019 | 8/21/2019 | 8/21/2019 | P | PASS |
Mike Jordan
|
|
|
Desmond (?)-pour time 4:00 Phone #: ###-####
|
BLD-Footing | 8/19/2019 | 8/19/2019 | 8/19/2019 | P | PASS |
Mike Jordan
|
|
|
irma Phone #: ###-####
|
BLD-Conference | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | DONE |
Mike Jordan
|
|
|
Greg Phone #: ###-####. Met contractor on site to observe the finished excavation. Material is 7 to 8 inch minus pit run. Per the contractor, non is fill matersl, all cut. Did note that the top 6 to 8 inches is losse. It was decided to compactbottom of excavation prior to buildinng forms.
|
OVERRIDE | | | 7/25/2019 | | |
|
|
|
|
Routing - FIRE | 7/24/2019 | 7/24/2019 | 7/25/2019 | | PASS |
Lee G Meredith
|
|
|
08/06-10604 Cruser resubmittal LGM Paper
Sprinklers are not required. See plan reviewers activity dated 7/24/19.
|
Plan assigned to (J_N) | 7/16/2019 | 7/16/2019 | 7/25/2019 | | DONE |
|
|
|
07/29 sfd L1 Paper. 1st complete 7/24, failed fire review - flag lot
|
Case Summary (BLD) | | | 7/25/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/25/2019 | | DONE |
Jenny Nelson
|
|
|
|
Inspection Record Card- Bld | | | 7/25/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/25/2019 | | DONE |
|
|
|
met
|
Inspection Record Card- Bld | | | 7/25/2019 | | DONE |
|
|
|
|
Telephone call | | | 7/25/2019 | | DONE |
|
|
|
spoke with tyler informing him that this permit is ready and the fee amount due for issuance
|
Issue PAID IN FULL permit | | | 7/25/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/22/2019 | | 7/24/2019 | | PASS |
Jenny Nelson
|
|
|
|
1st review completed | | | 7/24/2019 | | DONE |
Jenny Nelson
|
|
|
|
Plan Reviewer's activity | | | 7/24/2019 | | DONE |
|
|
|
Ron Johnson indicated that the property will not be required to have residential sprinklers (due to excessive distance to a hydrant) as long as the driveway requirements of 75,000 pound rating and 20 feet wide are met. Tyler Pond indicated that he believes the driveway weight rating is adequate and has sent an email that says he will not hold the fire department responsible for damage if they have to use it.
|
Routing - FIRE | 7/22/2019 | 7/22/2019 | 7/23/2019 | | FAIL |
Lee G Meredith
|
|
|
08/29-10604 W Cruser 402 Paper
Sprinkelrs required due to excessive distance of driveway and distance to nearest hydrant. Revise and resubmit.
|
Routing - MECHANICAL | 7/23/2019 | | 7/23/2019 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 7/17/2019 | | 7/22/2019 | | FAIL |
Troy James
|
|
|
Emailed comments to Integrity and talked to Jackie to revise Rescheck. Rescheck showing continuous insulation at ceiling.
|
Route to Impact Fee Review | 7/16/2019 | 7/19/2019 | 7/17/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 7/16/2019 | | 7/17/2019 | | PASS |
Jeff Lowe
|
|
|
|
Routing - Addressing | 7/16/2019 | | 7/17/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 7/16/2019 | | 7/17/2019 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 7/16/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/16/2019 | | DONE |
|
|
|
|
Application received | | 7/16/2019 | | | |
|
|
|
|