BLD-Final | 1/6/2020 | 1/7/2020 | 1/7/2020 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Donald Sorrells
|
DOC - Permit Finaled | 1/7/2020 | 1/7/2020 | 1/7/2020 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Donald Sorrells,, ok to cover 3rd level area
|
BLD-Framing/Rough-in | 9/3/2019 | 9/4/2019 | 9/4/2019 | P | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Donald Sorrells,, 3rd floor frame,, conf. only,, needs trades 1st
|
BLD-Foundation | 8/7/2019 | 8/9/2019 | 8/9/2019 | A | PASS |
Tell Riley
|
|
|
Please call prior to coming. Phone #: ###-#### Inspection requested via web by Donald Sorrells//footings for point loads//
|
BLD-Conference | 8/2/2019 | 8/5/2019 | 8/5/2019 | A | PART |
Tony Young
|
|
|
I fly out early afternoon so if its not to much trouble the earlier the better. Thanks sooooo much! Inspection requested via web by Donald Sorrells,,, ?s on footings
|
BLD-Framing/Rough-in | 7/31/2019 | 8/1/2019 | 8/1/2019 | A | PART |
Tony Young
|
|
|
If it is OK please call me....thanks much Phone #: ###-#### Inspection requested via web by Donald Sorrells// interior point load studs ok to cover,, no trades work in those areas
|
BLD-Conference | 7/22/2019 | 7/22/2019 | 7/22/2019 | P | DONE |
Tell Riley
|
|
|
Donald Phone #: ###-####
|
Routing Walk-In (BLD) | 7/22/2019 | 7/22/2019 | 7/22/2019 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 7/16/2019 | 7/16/2019 | 7/22/2019 | | PASS |
Josh Bogle
|
|
|
07/22 deck, paper
|
Routing PW Grading-Hillside | 7/16/2019 | | 7/22/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing - PLAN CHECK | 7/16/2019 | | 7/22/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 7/22/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/22/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/22/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/22/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 7/22/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/22/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 7/17/2019 | 7/17/2019 | 7/17/2019 | P | FAIL |
Josh Bogle
|
|
|
discussed what extra info will be needed for Building Plan Review
|
Routing Walk-In (Zoning) | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Ethan Mansfield
|
|
|
|
Routing Walk-In (BLD) | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Josh Bogle
|
|
|
took in as a level two - routed to Hillside
|
Application received | | 7/16/2019 | | | |
|
|
|
|