Permit Information
Permit NumberBLD19-02649
StatusFinaled
Name SUMMIT WALL SYSTEMS
Site Address 880 W STATE ST
Project NameVestibule Enclosure - Church
Customer Number 
ePlanReviewYes
Description
(FIRST CHURCH OF CHRIST SCIENTISTS) This building is NOT fire sprinklered. Permit to enclose a covered Breezeway of an existing 5,977 sq ft building built in 1989 and turn it into a Vestibule (adding 74 sq ft). This permit is approved contingent upon adhering to the approved plans on file. Work is to include: Relocating the existing exterior door to the new exterior of the Vestibule, replace with new door at Hallway, minor electrical, relocate hose bib, cover existing stucco within Vestibule with gypsum board, new acoustical ceiling and interior finishes in compliance with Ch. 8 of the 2015 IBC. A letter of completion to be issued since there is no change of Occupancy Load or Use. ***BJM***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  1/16/2020 DONE
Vanessa Ibrahim from Summit Wall sent in final values. However, there was a large discrepancy in the plumbing values. Upon further review, and a phone call to Drake Mechanical it was determined that Drake's plumbing permit shouldn't have been associated with any building permit . Summit said they moved a hose bib. I spoke with Dan and he said that they must pull a permit for moving a hose bib. I let Vanessa know. Once that permit is pulled and finaled, I will enter the final values.
First Notice12/19/201912/19/201912/30/2019 DONE
DetailsTony Young
mailed 1-1-20
BLD-Final12/19/201912/19/201912/19/2019PDONE
DetailsTony Young
Bret Phone #: ###-####
DOC - Permit Finaled12/19/201912/19/201912/19/2019PPASS
DetailsTony Young
done
BLD-Footing10/7/201910/7/201910/7/2019PPASS
DetailsTony Young
Brett Phone #: ###-####
Telephone call  9/23/2019 DONE
Emailed Brian to inform him that not all the fees were paid and once the remaining fees are paid, we can issue the permits.
Issue PAID IN FULL permit  9/23/2019 DONE
Inspection Record Card- Bld  9/23/2019 DONE
Permit Ready to Issue  9/20/2019 DONE
all met: brian@summitwall.com

NEED
GC FORM
REVISED VALUE (BRIAN DID NOT PROVIDE COMPANY- DOUBLE CHECK)
Plan assigned to (BJM)7/31/20197/31/20199/19/2019 DONE
DetailsBrian McGowan
09/09- 1st Review Complete- L1 Church Vestibule ePlan
Routing - PLAN CHECK9/19/2019 9/19/2019 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  9/19/2019 DONE
DetailsBrian McGowan
Route to Impact Fee Review8/22/20198/25/20198/22/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
1st review completed  8/22/2019 FAIL
DetailsBrian McGowan
Routing - PLAN CHECK7/31/2019 8/22/2019 FAIL
DetailsBrian McGowan
Routing - Design Review7/31/2019 7/31/2019 PASS
DetailsKatelyn Menuge
Intake Approval  7/30/2019 PASS
DetailsJavier Guzman
Intake Approval  7/19/2019 FAIL
DetailsJulie Romig
1. On all drawing sheets (specifically A101, G003, G004) leave blank 4"x2" space for City of Boise stamp located in the bottom right hand corner, 3" off the right sheet edge. nhttps://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
2. Provide hardware schedule for new and relocated doors.
3. Provide U-factor and SHGC for new envelope storefront door and glazing. Provide R-value for new envelope above storefront.
Application received  7/16/2019 DONE
Application submitted via PDS Online on Jul 16 2019 3:00PM