Permit Information
Permit NumberBLD19-02650
StatusFinaled
Name TRINITY FELLOWSHIP
Site Address 300 N LATAH ST
Project NameBoise Cooperative Preschool
Customer Number 
ePlanReviewYes
Description
(BOISE COOPERATIVE PRESCHOOL – DAYCARE EXPANSION – TRINITY FELLOWSHIP CHURCH) (CUP02-00060) This building does not have a fire sprinkler system. To convert a church classroom within an existing church to a daycare for children more than 2.5 years of age. The existing 919 square foot child daycare is being expanded by about 716 square feet. Including the expansion area, the total area used as a child daycare is about 1,635 square feet. The maximum allowed number of children is 34. Since the total occupant load of the expanded child daycare is less than 50 occupants, the existing fire alarm system was not required to be upgraded to comply with current standards. The fire alarm is required to be maintained, as regulated by the Fire Department, in compliance with the standards in effect when it was installed. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/26/201911/27/201911/27/2019PPASS
DetailsTell Riley
Maureen Phone #: ###-####//no changes to existing//final complete//
FIRE-Final Inspection11/26/201911/27/201911/27/2019APASS
DetailsTroy Cobbley
life safety passed

Maureen Phone #: ###-####
Permanent Occupancy  11/27/2019 DONE
BLD-Final11/22/201911/25/201911/25/2019ACANC
DetailsTell Riley
Maureen Phone #: ###-####//cancel per contact//
FIRE-Final Inspection11/22/201911/25/201911/25/2019AFAIL
DetailsTroy Cobbley
Missing exit sign into Santuary/Corridor as marked on the approved plans. Maureen Phone #: ###-####
FIRE-Final Inspection11/14/201911/15/201911/15/2019ACANC
DetailsTroy Cobbley
Not ready per contact.

call 20 minutes before // maureen Phone #: ###-####
BLD-Final9/16/20199/20/20199/20/2019PNR
DetailsTell Riley
Maureen Phone #: ###-####//no one onsite--doors locked//need final on fire life safety prior to oocupancy inspection//
FIRE-Final Inspection9/16/20199/20/20199/20/2019AFAIL
DetailsTroy Cobbley
missing most small documents, missing exit signs and emergency lights need tested. No real inspection could be performed.

Maureen Phone #: ###-####
BLD-Final8/29/20198/30/20198/30/2019PNR
DetailsMike Jordan
Maureen Phone #: ###-####. Fire/life/safety final has failed.
FIRE-Final Inspection8/29/20198/30/20198/30/2019AFAIL
DetailsTroy Cobbley
No city approved documents on site. I did perform a courtesy inspection of typical life safety items. Maureen Phone #: ###-####
Issue PAID IN FULL permit  8/28/2019 DONE
Print Occupancy Form  8/28/2019 DONE
Telephone call  8/27/2019 DONE
spoke with lowell informing him we are good to go and the fee amount due for issuance
Plan assigned to (CJW)8/2/20198/23/20198/23/2019 PASS
DetailsCarl Westfall
(1st done) 08/16/19 (L-3 - 15 days) (eplan - 3 sheets) Boise Cooperative Preschool (waiting for fire)
PLANS/APPL TAKEN TO FRONT DESK  8/23/2019 DONE
Permit Ready to Issue  8/23/2019 DONE
Per Carl Westfall no work proposed on plans, for change of occupancy only. Verify with applicant/tenant no work being done, if correct, primary main site contact and no GC and No Revised cert of value is required//leg 8-26-19
Routing - FIRE8/2/20198/2/20198/21/2019 PASS
DetailsMark Scharfen
08/23-Boise Cooperative pre-school occupancy change. Review complete. Uploaded rev_fire 08.21.2019.pdf
Routing Off Site - C.D.H8/2/2019 8/21/2019 PASS
DetailsCarl D Madsen
1st review completed  8/21/2019 DONE
Plan Reviewer's activity  8/14/2019 DONE
Left voice mail message for CDHD asking them to make sure this one doe not fall through the cracks.
Routing - PLAN CHECK8/2/2019 8/14/2019 PASS
DetailsCarl Westfall
Approved with redlines
Routing - PLANNING8/2/2019 8/5/2019 PASS
DetailsNicolette Womack
Approved via CUP02-00060, which has continued to be in use.
Routing - Addressing8/2/2019 8/2/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS8/2/2019 8/2/2019 PASS
DetailsAngela Hardy
Intake Approval  7/29/2019 PASS
Application received  7/16/2019 DONE
Application submitted via PDS Online on Jul 16 2019 3:49PM