BLD-Conference | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | PEND |
Jim Storey
|
|
|
possible work being done not per approved plans ele work w/o permit.
|
BLD-Framing/Rough-in | 10/10/2019 | 10/11/2019 | 10/11/2019 | P | PART |
Jim Storey
|
|
|
sHELLEY Phone #: ###-#### anchor bolts installed ok no hd required// framing ok pending ele permit.
|
BLD-Framing/Rough-in | 10/3/2019 | 10/4/2019 | 10/4/2019 | A | NR |
Jim Storey
|
|
|
Shelley Phone #: ###-#### need aproved plans/ ele permit and insp/finsh hd instal.
|
BLD-Footing | 9/11/2019 | 9/12/2019 | 9/12/2019 | A | PASS |
Jim Storey
|
|
|
Harvey Phone #: ###-####
|
Routing Walk-In (BLD) | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | DONE |
Josh Bogle
|
|
|
submiting additional documantation on this permit
|
Routing - PLAN CHECK | 9/3/2019 | | 9/3/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/3/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/3/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/3/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 9/3/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/3/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/3/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/18/2019 | | 7/18/2019 | | FAIL |
Josh Bogle
|
|
|
needs engineeering stamp for roof framing & shear
|
1st review completed | | | 7/18/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 7/18/2019 | | | |
|
|
|
|