Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD19-02684
StatusIssued
Name MARY ELLEN STEWART
Site Address 5733 N ARMSTRONG AVE
Project NameStewart Home
Customer Number 
ePlanReviewYes
Description
**PLAN MODIFICATION 7/8/20 Changing wall bracing at garage JJN** **PLAN MODIFICATION changing pony wall measurements to reduce span of floor joists, also adding in new pony walls at front of house, and adding spread footers at covered patio. JJN 09-9-19** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2475 sq. ft., one story single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 360 sq. ft. of covered patio/porch and a 946 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference7/9/20207/10/20207/10/2020ADONE
DetailsTell Riley
Pete Stewart desires a consulting framing inspection Phone #: ###-#### Inspection requested via web by Peter Stewart
CHANGE STATUS TO (ISS)  7/9/2020 DONE
OVERRIDE  7/8/2020  
Plan assigned to (J_N)6/25/20206/25/20207/8/2020 DONE
DetailsJenny Nelson
plan mod - paper to ePlan
Routing - PLAN CHECK7/6/2020 7/8/2020 PASS
DetailsJenny Nelson
Permit Ready to Issue  7/8/2020 DONE
Plan Mod Do Not Reissue * MET
Telephone call  6/25/2020 DONE
Called and left applicant a voicemail to let them know they need only upload plan mod sheets in their ePlan
Plan Modification Accepted  6/24/2020 DONE
Peter Stewart has requested a plan mod for modification on the garage wall.
BLD-Aging Inspection6/19/20206/19/20206/23/2020 CANC
DetailsTell Riley
BLD-Aging Inspection6/18/20206/18/20206/19/2020 PASS
DetailsTell Riley
met with Pete last week on a conference//WIP//shear walls and roof will be completed soon//
BLD-Conference6/11/20206/11/20206/11/2020PDONE
DetailsTell Riley
Screened- please call if possible-Stewert Phone #: ###-####//shear questions//
Inspection Record Card- Bld  5/29/2020 DONE
BLD-Aging Inspection2/5/20202/5/20202/5/2020 PASS
DetailsTell Riley
WIP
BLD-Foundation9/19/20199/24/20199/24/2019PPASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Peter Stewart
BLD-Footing9/17/20199/18/20199/18/2019APASS
DetailsTell Riley
concrete at 11am // Peter Phone #: ###-####
CHANGE STATUS TO (ISS)  9/10/2019 DONE
OVERRIDE  9/9/2019  
Plan assigned to (J_N)9/5/20199/5/20199/9/2019 DONE
DetailsJenny Nelson
plan mod #1 2 large plans that reposition the under floor pony walls to reduce span distances.
Routing - PLAN CHECK9/9/2019 9/9/2019 PASS
DetailsJenny Nelson
Plan modification
Case Summary (BLD)  9/9/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  9/9/2019 DONE
plan mod approved
Telephone call  9/9/2019 DONE
Left voicemail for Peter to inform him the plan mod is ready and what fees are due.
Plan Modification Accepted  9/5/2019 DONE
plan mod #1 2 large plans that reposition the under floor pony walls to reduce span distances.
Plan Reviewer's activity  9/4/2019 DONE
DetailsMichael Hanson
Discussed the requirements for a plan mod in regards to the foundation changes the applicant would like to make. Applicant would like to go from 16x12 footing to 16x8 footing. Plan mod required.
Issue PAID IN FULL permit  8/8/2019 DONE
OVERRIDE  7/24/2019  
Plan assigned to (J_N)7/18/20197/18/20197/24/2019 DONE
DetailsJenny Nelson
07/31 sfd L1 Paper
Routing - PLAN CHECK7/23/2019 7/24/2019 PASS
DetailsJenny Nelson
Case Summary (BLD)  7/24/2019 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  7/24/2019 DONE
DetailsJenny Nelson
Inspection Record Card- Bld  7/24/2019 DONE
Permit Ready to Issue  7/24/2019 DONE
Met
(if parcel owner not GC 302 form needs to be filled out and RP needed)
Telephone call  7/24/2019 DONE
cleft message on ###-#### owner to inform him fees due and if GC is picking this up we will need RP
1st review completed  7/24/2019 DONE
Routing - MECHANICAL7/19/2019 7/23/2019 PASS
DetailsTroy James
Route to Impact Fee Review7/18/20197/21/20197/19/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - PLANNING7/19/2019 7/19/2019 PASS
DetailsJeff Lowe
Routing - Addressing7/18/2019 7/19/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS7/18/2019 7/19/2019 PASS
DetailsAngela Hardy
Plans ACCEPTED BY PLAN TECH  7/18/2019 DONE
Intake Approval  7/18/2019 PASS
Recd Pcfee & Taken To Pln CK  7/18/2019 DONE
Application received 7/18/2019