BLD-Final | 10/25/2019 | 10/28/2019 | 10/28/2019 | A | PASS |
Mike Jordan
|
|
|
Zach Phone #: ###-####
|
DOC - Permit Finaled | 10/28/2019 | 10/28/2019 | 10/28/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 10/25/2019 | 10/25/2019 | 10/25/2019 | P | DEFR |
Jim Storey
|
|
|
Zach Phone #: ###-####//out of time
|
BLD-Framing/Rough-in | 9/3/2019 | 9/4/2019 | 9/4/2019 | A | PASS |
Tony Young
|
|
|
Zach Phone #: ###-####,, frame ok
|
Routing Walk-In (BLD) | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | DONE |
Josh Bogle
|
|
|
|
PubWorks Subgrade Approval | 8/14/2019 | 8/14/2019 | 8/14/2019 | | DONE |
Melissa Jannusch
|
|
|
If there are any new footings a letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing - PLAN CHECK | 8/14/2019 | | 8/14/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/14/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/14/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/14/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 8/14/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/14/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 7/19/2019 | 7/19/2019 | 7/19/2019 | A | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/19/2019 | | 7/19/2019 | | FAIL |
Josh Bogle
|
|
|
needs WUI notes and engineering for cantilever bearing
|
1st review completed | | | 7/19/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 7/19/2019 | | | |
|
|
|
|