DOC - Permit Finaled | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | PASS |
Tell Riley
|
|
|
please call before inspection Phone #: ###-#### Inspection requested via web by Matt Oranday//see ELE19-02722 for final electrical//
|
DOC - Permit Finaled | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | PASS |
Tell Riley
|
|
|
see electrical permit ele19-02722 for finakl
|
BLD-Final | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | CANC |
Tony Young
|
|
|
Please call before inspection Phone #: ###-#### >> Inspection requested via web by Matt Oranday Inspection cancelled from web by: Matt Oranday
|
BLD-Final | 8/12/2019 | 8/13/2019 | 8/13/2019 | A | NR |
Brandon Shaw
|
|
|
please call before inspection Phone #: ###-#### Inspection requested via web by Matt Oranday
|
Plan assigned to (RDP) | 8/5/2019 | 8/5/2019 | 8/5/2019 | | DONE |
Rob Patrick
|
|
|
|
Routing Walk-In (Zoning) | 8/5/2019 | 8/5/2019 | 8/5/2019 | P | PASS |
Sue Cummings
|
|
|
Still good
|
Routing Walk-In (BLD) | 8/5/2019 | 8/5/2019 | 8/5/2019 | | DONE |
Rob Patrick
|
|
|
|
Plan assigned to (JAB) Josh | 7/29/2019 | 7/29/2019 | 8/5/2019 | | CANC |
Josh Bogle
|
|
|
changed to paper walk-in on 8/5
|
Routing - PLAN CHECK | 7/29/2019 | | 8/5/2019 | | CANC |
Josh Bogle
|
|
|
changed to paper plans 8/5 in office for walk-in review
|
Routing - PLAN CHECK | 8/5/2019 | | 8/5/2019 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 8/5/2019 | | DONE |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 8/5/2019 | | DONE |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 8/5/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/5/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 8/5/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/5/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/29/2019 | | DONE |
|
|
|
no fees paid at intake
|
Application received | | | 7/23/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 23 2019 8:03AM
|
Plans ACCEPTED BY PLAN TECH | | | 7/23/2019 | | FAIL |
|
|
|
Unable to do prescreens because Placecards.pdf, Racking.pdf, and Site Plan.pdf drawings did not uploaded correctly. Please re-upload.
|