BLD-Final | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
DOC - Permit Finaled | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.84
|
BLD-Blower Door Test Results | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | CANC |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Blower Door Test Results | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | CANC |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
PubWorks Occupancy Approval | 1/17/2020 | 1/17/2020 | 1/17/2020 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 10/24/2019 | 10/24/2019 | 10/24/2019 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Other | 10/22/2019 | 10/23/2019 | 10/23/2019 | A | PASS |
Brandon Shaw
|
|
|
sofit // Les Phone #: ###-####
|
BLD-Framing/Rough-in | 10/22/2019 | 10/22/2019 | 10/22/2019 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT... OK to insulate...
|
BLD-Framing/Rough-in | 10/15/2019 | 10/15/2019 | 10/15/2019 | P | FAIL |
Brandon Shaw
|
|
|
Provide an approved Engineer fix for A11 truss with 8' of missing bottom cord... Per plans- (4) 2x6 needed ar corner point load- breakfast nook... Per plans- (2) 2x10 called for at center window, breakfasr nook... Verify (2) 9 1/2 LvL and LSTA24 straps are in place- see plans... Verify BTM cord to DBL top plate with A34 anchors at 32" o.c....
|
BLD-Wall Bracing | 9/19/2019 | 9/20/2019 | 9/20/2019 | A | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Foundation | 8/30/2019 | 8/30/2019 | 8/30/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 8/28/2019 | 8/28/2019 | 8/28/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
PubWorks Subgrade Approval | 8/28/2019 | 8/28/2019 | 8/28/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department.
|
Issue PAID IN FULL permit | | | 8/16/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/16/2019 | | DONE |
|
|
|
|
Telephone call | | | 8/16/2019 | | DONE |
|
|
|
MET- email permits to be signed to- kdavis@boisehunterhomes.com
eplan needs to be release
|
OVERRIDE | | | 8/6/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 7/26/2019 | 7/26/2019 | 8/6/2019 | | DONE |
Jenny Nelson
|
|
|
08/14 sfd L2 ePlan
|
Routing - PLAN CHECK | 7/26/2019 | | 8/6/2019 | | PASS |
Jenny Nelson
|
|
|
|
1st review completed | | | 8/6/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/6/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 8/6/2019 | | DONE |
|
|
|
met
|
Routing - Erosion and Sediment | 7/26/2019 | | 7/30/2019 | | PASS |
Michael Zawacki
|
|
|
Harris North foothills lot.
|
Route to Impact Fee Review | 7/26/2019 | 7/29/2019 | 7/29/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 7/26/2019 | | 7/29/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 7/26/2019 | | 7/29/2019 | | PASS |
Sue Cummings
|
|
|
|
Routing PW Grading-Hillside | 7/26/2019 | | 7/29/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - FIRE | 7/26/2019 | 7/26/2019 | 7/26/2019 | | PASS |
Lee G Meredith
|
|
|
Sprinklers are not required.
|
Plans ACCEPTED BY PLAN TECH | | | 7/26/2019 | | DONE |
|
|
|
|
Intake Approval | | | 7/26/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/26/2019 | | DONE |
|
|
|
|
Routing - Addressing | 7/26/2019 | | 7/26/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 7/26/2019 | | 7/26/2019 | | PASS |
Angela Hardy
|
|
|
|
Application received | | | 7/23/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 23 2019 11:59AM
|