Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-02775
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2877 S GREBE PL
Project NameHarris North Lot 63 Block 1
Customer Number 
ePlanReviewYes
Description
**W.U.I. HILLSIDE ZONE A CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR SIDING REQUIRED** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 3395 sq. ft., two story (first story 2534 sq. ft., second story 861 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 301 sq. ft. of covered patio/porch and a 1134 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. JJN ***SPRINKLERS ARE NOT REQUIRED*** LGM A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/17/20201/17/20201/17/2020APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled1/17/20201/17/20201/17/2020PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results1/17/20201/17/20201/17/2020ADONE
DetailsBrandon Shaw
ACH50- 3.89
PubWorks Occupancy Approval1/17/20201/17/20201/17/2020 DONE
DetailsMelissa Jannusch
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Energy code compliance10/28/201910/29/201910/29/2019APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Other10/24/201910/25/201910/25/2019APASS
DetailsJim Storey
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Framing/Rough-in10/24/201910/25/201910/25/2019APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Wall Bracing10/3/201910/4/201910/4/2019APART
DetailsBrandon Shaw
First floor only...
BLD-Foundation9/6/20199/6/20199/6/2019PCANC
DetailsBrandon Shaw
Dion Phone #: ###-#### Inspection cancelled from web by: Gus Brandon
BLD-Footing9/4/20199/4/20199/4/2019PPASS
DetailsBrandon Shaw
Work in progress...
PubWorks Subgrade Approval9/3/20199/3/20199/3/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  8/28/2019 DONE
Inspection Record Card- Bld  8/28/2019 DONE
OVERRIDE  7/30/2019  
Plan assigned to (J_N)7/26/20197/26/20197/30/2019 DONE
DetailsJenny Nelson
08/14 sfd L2 ePlan
Routing - PLAN CHECK7/26/2019 7/30/2019 PASS
DetailsJenny Nelson
Routing - MECHANICAL7/26/2019 7/30/2019 PASS
DetailsTroy James
Routing - Erosion and Sediment7/26/2019 7/30/2019 PASS
DetailsMichael Zawacki
Harris North foothills lot.
Routing PW Grading-Hillside7/29/2019 7/30/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
1st review completed  7/30/2019 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  7/30/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  7/30/2019 DONE
Route to Impact Fee Review7/26/20197/29/20197/29/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - FIRE7/26/20197/26/20197/29/2019 PASS
DetailsLee G Meredith
No sprinklers required.
Routing - PLANNING7/26/2019 7/29/2019 PASS
DetailsSue Cummings
Routing - Addressing7/26/2019 7/29/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS7/26/2019 7/29/2019 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  7/26/2019 DONE
Intake Approval  7/26/2019 PASS
Recd Pcfee & Taken To Pln CK  7/26/2019 DONE
Application received  7/24/2019 DONE
Application submitted via PDS Online on Jul 24 2019 1:28PM