BLD-Final | 1/13/2020 | 1/14/2020 | 1/14/2020 | A | PASS |
Jim Storey
|
|
|
Please call when on the way. I can meet you and let you in the project. Thanks Phone #: ###-#### Inspection requested via web by Nathan Taylor
|
DOC - Permit Finaled | 1/14/2020 | 1/14/2020 | 1/14/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 8/22/2019 | 8/23/2019 | 8/23/2019 | A | PASS |
Jim Storey
|
|
|
Please call when on the way and I will meet you. Thanks Phone #: ###-#### Inspection requested via web by Nathan Taylor
|
BLD-Framing/Rough-in | 8/20/2019 | 8/21/2019 | 8/21/2019 | P | PASS |
Jim Storey
|
|
|
Please call when on the way. I will meet you there. Thanks. Phone #: ###-#### Inspection requested via web by Nathan Taylor
|
Routing Walk-In (BLD) | 7/25/2019 | 7/25/2019 | 7/25/2019 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/25/2019 | | 7/25/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/25/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/25/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/25/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 7/25/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/25/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 7/24/2019 | 7/24/2019 | 7/24/2019 | P | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 7/24/2019 | | 7/24/2019 | | FAIL |
Brian McGowan
|
|
|
Need more drawings showing the existing structure and what he is replacing. Verify size of 20' beam over kitchen area.
|
1st review completed | | | 7/24/2019 | | DONE |
Brian McGowan
|
|
|
|
Application received | | 7/24/2019 | | | |
|
|
|
|