Second Notice | | 4/13/2020 | 5/5/2020 | | DONE |
|
|
|
This permit finaled on the web by Samantha Tallman
|
First Notice | 3/23/2020 | 3/23/2020 | 4/3/2020 | | DONE |
Jim Storey
|
|
|
mailed 4-6-2020
|
BLD-Final | 3/20/2020 | 3/23/2020 | 3/23/2020 | A | PASS |
Jim Storey
|
|
|
Mark Nearman is contact Phone #: ###-#### Inspection requested via web by mark nearman
|
DOC - Permit Finaled | 3/23/2020 | 3/23/2020 | 3/23/2020 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 3/23/2020 | 3/23/2020 | 3/23/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 3/17/2020 | 3/17/2020 | 3/17/2020 | P | NR |
Jim Storey
|
|
|
Tenant Improvement final Phone #: ###-#### Inspection requested via web by mark nearman open mec permit
|
FIRE-Final Inspection | 3/16/2020 | 3/17/2020 | 3/17/2020 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection for area of work complete, signature provided on permit sign off card. As stated in project description, no occupancy allowed under this permit.
For Cert. of Completion only Project has added 1 exit device, 1 egress light of which there were none previously. Phone #: ###-#### Inspection requested via web by mark nearman
|
BLD-Framing/Rough-in | 11/12/2019 | 11/13/2019 | 11/13/2019 | P | CANC |
Jim Storey
|
|
|
Contact is Mark. framing for drywall cover Phone #: ###-#### >> Inspection requested via web by mark nearman Inspection cancelled from web by: mark nearman
|
Issue PAID IN FULL permit | | | 10/10/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/10/2019 | | DONE |
|
|
|
|
Telephone call | | | 9/5/2019 | | DONE |
|
|
|
Spoke with Brook informing her that there will need to be two 306 forms (one for each permit) and that i was unable to take the 306 form turned and signed by her because the some with Wright brothers needs to sign the form.
|
Permit Ready to Issue | | | 8/19/2019 | | DONE |
|
|
|
ALL MET
NEED
REVISED VALUE (one not turned in for this permit)
MET
GC FORM
|
Plan assigned to (JAR) | 6/6/2019 | 6/6/2019 | 8/14/2019 | | DONE |
Julie Romig
|
|
|
1st Rev Comp - 2nd Rev Comp - L3 1111 Broadway TI - Middle Space
|
Routing - Erosion and Sediment | 6/6/2019 | | 8/14/2019 | | PASS |
Michael Zawacki
|
|
|
TI, no ESC required per MPZ comments under related permit BLD19-01558 and ePlanReview.
|
Routing - PLAN CHECK | 8/12/2019 | | 8/14/2019 | | PASS |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/14/2019 | | DONE |
|
|
|
|
Routing - Design Review | 8/12/2019 | | 8/12/2019 | | PASS |
Josh Wilson
|
|
|
|
Routing - MECHANICAL | 6/6/2019 | | 7/29/2019 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 7/25/2019 | 7/30/2019 | 7/26/2019 | | PASS |
Eric Bilimoria
|
|
|
|
Routing - FIRE | 6/3/2019 | 6/6/2019 | 7/26/2019 | | PASS |
Mark Scharfen
|
|
|
Uploaded rev_fire 07.26.2019.pdf. review complete.
|
Routing - PLUMBING | 6/6/2019 | | 7/26/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC
|
Routing - Addressing | 6/6/2019 | | 7/26/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/6/2019 | | 7/25/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - PLAN CHECK | 6/6/2019 | | 7/25/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing PW Drainage | 6/6/2019 | | 7/25/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING | 6/24/2019 | | 7/25/2019 | | PASS |
Nicolette Womack
|
|
|
|
Routing - PLAN CHECK | 7/18/2019 | | 7/25/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing - Design Review | 7/18/2019 | | 7/18/2019 | | FAIL |
Andrea Tuning
|
|
|
Failed 2nd review per BLD19-01558
|
1st review completed | | | 6/28/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLANNING | 6/6/2019 | | 6/11/2019 | | FAIL |
Nicolette Womack
|
|
|
Failed 1st review per BLD19-01558
|
Routing - Design Review | 6/6/2019 | | 6/6/2019 | | FAIL |
Andrea Tuning
|
|
|
Failed 1st review per BLD19-01558
Submit a landscape plan designed by a landscape professional. The plan shall include four (4) Class II street trees along Broadway Avenue that are approved by the Boise City Tree Selection Guide as well as appropriate landscaping within the planter located to the west of the drive through lane that includes trees, shrubs and an appropriate mulch. This will require a solid concrete curbing and landscaping to restrict the drive through lanes as shown on the site plan that was reviewed and approved.
Provide a weather protection device that is a minimum of 3-feet in depth for each of the two primary business entries.
|
Intake Approval | | | 6/3/2019 | | PASS |
Brian McGowan
|
|
|
Intake approval 6/3/19
|
Intake Approval | | | 5/13/2019 | | FAIL |
Brian McGowan
|
|
|
|
Application received | | 7/25/2019 | | | |
|
|
|
|