Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD19-02818
StatusFinaled
Name MURPHY CONSTRUCTION CO
Site Address 1819 S FEDERAL WAY
Project NameOliver Shed
Customer Number 
ePlanReviewNo
Description
MODIFICATION - ADDING AN ENGINEERED 120SQ' PATIO COVER TO THE FRONT OF THE SHED. 10/29/19 **jab** Permit to build a 16'x24' shed on piers drilled into an existing slab. All work per plans, notations, local codes & ordinances.**JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/5/201911/5/201911/5/2019PPASS
DetailsJim Storey
go behind the school at 1845 - Gina Phone #: ###-#### planreviwer occ r3 appears to be a u occ lacking r3 requriments.
DOC - Permit Finaled11/5/201911/5/201911/5/2019PPASS
DetailsJim Storey
BLD-Footing10/31/201911/1/201911/1/2019APASS
DetailsJim Storey
late morning // scott Phone #: ###-####
Routing Walk-In (BLD)10/29/201910/29/201910/29/2019PDONE
DetailsJosh Bogle
Plan assigned to (JAB) Josh10/29/201910/29/201910/29/2019 PASS
DetailsJosh Bogle
Routing - PLAN CHECK10/29/2019 10/29/2019 PASS
DetailsJosh Bogle
Case Summary (BLD)  10/29/2019 DONE
DetailsJosh Bogle
Permit Ready to Issue  10/29/2019 DONE
CHANGE STATUS TO (ISS)  10/29/2019 DONE
Plan Modification Accepted  10/29/2019 DONE
Andrew Ross in for plan mod.
Routing Walk-In (BLD)10/28/201910/28/201910/28/2019AFAIL
DetailsJosh Bogle
additional work requires engineering
BLD-Final9/19/20199/19/20199/19/2019PFAIL
DetailsJim Storey
Enter at 1845 S Federal Way (Peace Valley Charter School), check in at the front desk and they can assist if needed. Phone #: ###-#### Inspection requested via web by Scott Murphy
double 2x8 at all headers// shed roof not aproved with plan set up grade wiyh plan review.
CHANGE STATUS TO (ISS)  9/9/2019 DONE
added and back dated missing Permit Ready to Issue activity
BLD-Framing/Rough-in8/6/20198/7/20198/8/2019PNR
DetailsJim Storey
enter in through 1845 Federal- Gina Phone #: ###-#### ft insp.
BLD-Footing8/7/20198/7/20198/7/2019PPASS
DetailsJim Storey
enter in through 1845 Federal- Gina Phone #: ###-####
Routing Walk-In (BLD)8/1/20198/1/20198/1/2019ADONE
DetailsJosh Bogle
Plan assigned to (JAB) Josh7/26/20197/26/20198/1/2019 PASS
DetailsJosh Bogle
08/01 shed, ePlan - 1st done, applicant took all paperwork, nothing on file
Routing - PLAN CHECK8/1/2019 8/1/2019 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  8/1/2019 DONE
DetailsJosh Bogle
Case Summary (BLD)  8/1/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  8/1/2019 DONE
DetailsJosh Bogle
ESc no - Energy no
Issue PAID IN FULL permit  8/1/2019 DONE
Permit Ready to Issue  8/1/2019 DONE
Routing Walk-In (Zoning)7/31/20197/31/20197/31/2019PPASS
DetailsJeff Lowe
doing a shed instead of a pavilion
Routing Walk-In (BLD)7/31/20197/31/20197/31/2019PFAIL
DetailsJosh Bogle
1st review completed  7/31/2019 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK7/26/2019 7/31/2019 FAIL
DetailsJosh Bogle
no footings, braced walls, or headers shown
Application received  7/26/2019 DONE
Application submitted via PDS Online on Jul 26 2019 8:50AM
Intake Approval  7/26/2019 FAIL
drawings need to be faced the correct way (landscape, not sideways)
Intake Approval  7/26/2019 PASS
Recd Pcfee & Taken To Pln CK  7/26/2019 DONE
no intake fees paid at intake
Routing - PLANNING7/26/2019 7/26/2019 PASS
DetailsJeff Lowe