BLD-Final | 11/5/2019 | 11/5/2019 | 11/5/2019 | P | PASS |
Jim Storey
|
|
|
go behind the school at 1845 - Gina Phone #: ###-#### planreviwer occ r3 appears to be a u occ lacking r3 requriments.
|
DOC - Permit Finaled | 11/5/2019 | 11/5/2019 | 11/5/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Footing | 10/31/2019 | 11/1/2019 | 11/1/2019 | A | PASS |
Jim Storey
|
|
|
late morning // scott Phone #: ###-####
|
Routing Walk-In (BLD) | 10/29/2019 | 10/29/2019 | 10/29/2019 | P | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 10/29/2019 | 10/29/2019 | 10/29/2019 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/29/2019 | | 10/29/2019 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/29/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 10/29/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/29/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 10/29/2019 | | DONE |
|
|
|
Andrew Ross in for plan mod.
|
Routing Walk-In (BLD) | 10/28/2019 | 10/28/2019 | 10/28/2019 | A | FAIL |
Josh Bogle
|
|
|
additional work requires engineering
|
BLD-Final | 9/19/2019 | 9/19/2019 | 9/19/2019 | P | FAIL |
Jim Storey
|
|
|
Enter at 1845 S Federal Way (Peace Valley Charter School), check in at the front desk and they can assist if needed. Phone #: ###-#### Inspection requested via web by Scott Murphy double 2x8 at all headers// shed roof not aproved with plan set up grade wiyh plan review.
|
CHANGE STATUS TO (ISS) | | | 9/9/2019 | | DONE |
|
|
|
added and back dated missing Permit Ready to Issue activity
|
BLD-Framing/Rough-in | 8/6/2019 | 8/7/2019 | 8/8/2019 | P | NR |
Jim Storey
|
|
|
enter in through 1845 Federal- Gina Phone #: ###-#### ft insp.
|
BLD-Footing | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Jim Storey
|
|
|
enter in through 1845 Federal- Gina Phone #: ###-####
|
Routing Walk-In (BLD) | 8/1/2019 | 8/1/2019 | 8/1/2019 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 7/26/2019 | 7/26/2019 | 8/1/2019 | | PASS |
Josh Bogle
|
|
|
08/01 shed, ePlan - 1st done, applicant took all paperwork, nothing on file
|
Routing - PLAN CHECK | 8/1/2019 | | 8/1/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/1/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/1/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/1/2019 | | DONE |
Josh Bogle
|
|
|
ESc no - Energy no
|
Issue PAID IN FULL permit | | | 8/1/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/1/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 7/31/2019 | 7/31/2019 | 7/31/2019 | P | PASS |
Jeff Lowe
|
|
|
doing a shed instead of a pavilion
|
Routing Walk-In (BLD) | 7/31/2019 | 7/31/2019 | 7/31/2019 | P | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 7/31/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/26/2019 | | 7/31/2019 | | FAIL |
Josh Bogle
|
|
|
no footings, braced walls, or headers shown
|
Application received | | | 7/26/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 26 2019 8:50AM
|
Intake Approval | | | 7/26/2019 | | FAIL |
|
|
|
drawings need to be faced the correct way (landscape, not sideways)
|
Intake Approval | | | 7/26/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/26/2019 | | DONE |
|
|
|
no intake fees paid at intake
|
Routing - PLANNING | 7/26/2019 | | 7/26/2019 | | PASS |
Jeff Lowe
|
|
|
|