BLD-Final | 1/3/2020 | 1/7/2020 | 1/7/2020 | P | PASS |
Mike Jordan
|
|
|
Amy Phone #: ###-####
|
DOC - Permit Finaled | 1/7/2020 | 1/7/2020 | 1/7/2020 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 1/3/2020 | 1/6/2020 | 1/6/2020 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. I spoke to amy about the need to remove the thumbturn dead bolt from the office door prior to a building inspection.
Amy Phone #: ###-####
|
BLD-Final | 1/2/2020 | 1/3/2020 | 1/3/2020 | P | NR |
Mike Jordan
|
|
|
amy Phone #: ###-####. Needs fire final first. Contacted Amy at above number and left message.
|
BLD-Framing/Rough-in | 11/26/2019 | 11/27/2019 | 11/27/2019 | A | PASS |
Mike Jordan
|
|
|
Amy Phone #: ###-####. Interior wood frmaed walls ok.
|
BLD-Framing/Rough-in | 11/26/2019 | 11/26/2019 | 11/26/2019 | P | NR |
Mike Jordan
|
|
|
Amy Phone #: ###-####. Needs to provide the approved set of plans.
|
Issue PAID IN FULL permit | | | 9/23/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/23/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/13/2019 | | 9/13/2019 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/13/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 9/13/2019 | | DONE |
|
|
|
all met: happylifeboise@gmail.com
GC ccoltonase@hotmail.com
NEED
GC form
Revised Certificate of Value
AND/OR if tenant is acting as GC need letter form parcel owner
|
Plan assigned to (M_H) | 8/27/2019 | | 9/13/2019 | | DONE |
Michael Hanson
|
|
|
1st review completed - 09/05 #518 L2 ePlan - Happy Life Supplements
|
Routing - PLUMBING | 9/10/2019 | | 9/10/2019 | | PASS |
Dan Ediger
|
|
|
See Redline notes. Per ISPC Plans
|
Routing - PLAN CHECK | 9/9/2019 | | 9/10/2019 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required.
|
Route to Impact Fee Review | 9/5/2019 | 9/8/2019 | 9/6/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 9/5/2019 | | FAIL |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 8/27/2019 | | 9/5/2019 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required.
|
Routing - Addressing | 8/27/2019 | | 8/28/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PLUMBING | 8/27/2019 | | 8/28/2019 | | FAIL |
Dan Ediger
|
|
|
Provide plumbing drawings and specifications.
|
Routing - MECHANICAL | 8/27/2019 | | 8/27/2019 | | PASS |
Chad Schwendiman
|
|
|
Shows a high temp dishwasher. Heat load from dish washer will be accounted for in HVAC system. No mechanical plans required.
|
Routing - PUBLIC WORKS | 8/27/2019 | | 8/27/2019 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 8/23/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 8/6/2019 | | FAIL |
Michael Hanson
|
|
|
This permit has failed prescreen due to the following:
1. Missing #304 form completed and signed
2. Building plans must be minimum 18"x24" pdf sheet size
3. Missing coversheet with table of contents, Code analysis/building data
4. Missing portable fire extinguisher location
5. Missing interior elevations with dimensions to confirm accessibility requirements (counters, point of sale, etc...)
|
Application received | | | 7/26/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 26 2019 12:48PM
|