Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-02838
StatusFinaled
Name BLUE RAVEN SOLAR LLC
Site Address 4310 N MARYLEBONE WAY
Project NameJulie White
Customer Number 
ePlanReviewYes
Description
**PLAN MODIFICATION - Changing panel type 10/04/19 JJN** Permit for 560sq' of roof-mounted, grid-tied Photo-voltaic panels with micro-inverters; 32 panels in 3 arrays tying into a SquareD panel. No work needed to strengthen the existing roof structure per engineer’s roof evaluation. All racking, modules, and other listed equipment must be installed by a certified installer. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. JJN
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/15/201911/18/201911/18/2019PPASS
DetailsTell Riley
MAIN CONTACT - Brian Prussia: ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting
DOC - Permit Finaled11/18/201911/18/201911/18/2019PPASS
DetailsTell Riley
BLD-Framing/Rough-in11/15/201911/18/201911/18/2019PCANC
DetailsTell Riley
MAIN CONTACT - Brian Prussia: ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting
BLD-Final10/1/201910/7/201910/7/2019PCANC
DetailsTell Riley
Cancel per Tia

Brian Prussia Phone #: ###-#### >> Inspection requested via web by BRS Permitting
CHANGE STATUS TO (ISS)  10/7/2019 DONE
Plan assigned to (J_N)10/3/201910/3/201910/4/2019 DONE
DetailsJenny Nelson
solar plan mod
Routing - PLAN CHECK10/4/2019 10/4/2019 PASS
DetailsJenny Nelson
1 HOUR PLAN MOD FEE
Routing - PLANNING10/4/2019 10/4/2019 PASS
DetailsSue Cummings
Permit Ready to Issue  10/4/2019 DONE
plan mod pleae do not re issue
Plan Modification Accepted  10/3/2019 DONE
Change the type of panels
BLD-Framing/Rough-in9/27/20199/30/20199/30/2019ACANC
DetailsTell Riley
Brian Prussia is best contact Phone #: ###-#### Inspection requested via web by BRS Permitting//framing inspection not needed//electrical rough scheduled today//call for final when complete//
Plan assigned to (J_N)8/8/20198/8/20198/8/2019 DONE
DetailsJenny Nelson
Plan assigned to (JAB) Josh7/29/20197/29/20198/8/2019 DEFR
DetailsJosh Bogle
08/02 PV, ePlan
Routing - PLAN CHECK7/29/2019 8/8/2019 PASS
DetailsJenny Nelson
ESC no, Energy no
1st review completed  8/8/2019 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  8/8/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  8/8/2019 DONE
Issue PAID IN FULL permit  8/8/2019  
Routing - PLANNING7/29/2019 7/29/2019 PASS
DetailsEthan Mansfield
Plans ACCEPTED BY PLAN TECH  7/29/2019 DONE
Intake Approval  7/29/2019 PASS
Recd Pcfee & Taken To Pln CK  7/29/2019 DONE
Application received  7/26/2019 DONE
Application submitted via PDS Online on Jul 26 2019 3:59PM