Third Notice | | 5/12/2020 | 7/9/2020 | | DONE |
|
|
|
mailed 7-9-2020
|
Second Notice | | 4/13/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020
|
Telephone call | | | 4/14/2020 | | DONE |
|
|
|
1st notice was return -unable to forward, call GC and got the new address and updated our record
|
First Notice | 3/9/2020 | 3/9/2020 | 4/3/2020 | | DONE |
Tell Riley
|
|
|
mailed 4-6-2020
|
BLD-Final | 3/9/2020 | 3/9/2020 | 3/9/2020 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Jones//complete per plans and plan modifications//
|
DOC - Permit Finaled | 3/9/2020 | 3/9/2020 | 3/9/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 2/25/2020 | 2/26/2020 | 2/26/2020 | P | NR |
Tell Riley
|
|
|
Steve Phone #: ###-####//need to change door per plan mod//
|
FIRE-Final Inspection | 2/25/2020 | 2/26/2020 | 2/26/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Steve Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 2/25/2020 | | DONE |
|
|
|
|
Plan assigned to (JAR) | 2/10/2020 | 2/10/2020 | 2/21/2020 | | DONE |
Julie Romig
|
|
|
plan mod #1 - record and revised on plan what was actually built. 2 copies of 2 large sheets
Plans taken to Julie
|
Routing - PLAN CHECK | 2/10/2020 | | 2/21/2020 | | PASS |
Julie Romig
|
|
|
|
Inspection Record Card- Bld | | | 2/21/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/21/2020 | | DONE |
|
|
|
Plan mod approved- fees due
|
Telephone call | | | 2/21/2020 | | DONE |
|
|
|
Spoke with Applicant to inform him the permit plan mod is ready and what fees are due.
|
Plan Modification Accepted | | | 2/10/2020 | | DONE |
|
|
|
plan mod #1 - record and revised on plan what was actually built. 2 copies of 2 large sheets
|
BLD-Final | 1/29/2020 | 1/30/2020 | 1/30/2020 | P | FAIL |
Brandon Shaw
|
|
|
See previous entry- Fire and Life... 30 day TCO is OK'd... No other issues...
|
FIRE-Final Inspection | 1/29/2020 | 1/30/2020 | 1/30/2020 | A | PART |
Jim Page
|
|
|
Reviewed plans are not in e-plan, blue prints were a paper print review. Floor plan has minor changes that need to be reflected on the city approved drawings. Provided the GC with the reviewers information for architect submittal. In field conditions are code compliant, city approved drawings need to reflect installed floor plan. 30 day TCO auhtorized for life fire safety, after plans are reviewed, acccepted and show floor plan changes then life fire safety can be finaled, signatures provided on permit sign off card.
Phone #: ###-#### Inspection requested via web by Steve Jones
|
BLD-Framing/Rough-in | 10/15/2019 | 10/15/2019 | 10/15/2019 | P | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Jones//wall cover only//plumbing rough in was completed on a different permit//
|
Issue PAID IN FULL permit | | | 9/10/2019 | | DONE |
|
|
|
|
Telephone call | | | 9/4/2019 | | DONE |
|
|
|
spoke with tom informing him that this permit is ready and we need from the GC 302 and 306 form before we can add in the rest of the fees
|
Plan assigned to (JAR) | 7/29/2019 | 7/29/2019 | 9/3/2019 | | DONE |
Julie Romig
|
|
|
1st Rev Comp - L2 Zelham Office Remodel
|
Routing - PLAN CHECK | 9/3/2019 | | 9/3/2019 | | PASS |
Julie Romig
|
|
|
|
Case Summary (BLD) | | | 9/3/2019 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/3/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/3/2019 | | DONE |
|
|
|
all met in person
Need
GC Form
Revised Cert of Value
|
Inspection Record Card- Bld | | | 9/3/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 8/8/2019 | 8/11/2019 | 8/9/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 7/30/2019 | | 8/8/2019 | | FAIL |
Julie Romig
|
|
|
Waiting for confirmation from Architect on Tenant occupying space.
|
1st review completed | | | 8/8/2019 | | DONE |
Julie Romig
|
|
|
|
Routing - PUBLIC WORKS | 7/29/2019 | | 7/30/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Addressing | 7/29/2019 | | 7/29/2019 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/29/2019 | | DONE |
|
|
|
|
Intake Approval | | | 7/29/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/29/2019 | | DONE |
|
|
|
|
Application received | | 7/29/2019 | | | |
|
|
|
|