BLD-Final | 4/28/2020 | 4/30/2020 | 4/30/2020 | A | PART |
Jim Storey
|
|
|
screened // Dennis Phone #: ###-#### e mail tony w blower door test .
|
DOC - Permit Finaled | 4/30/2020 | 4/30/2020 | 4/30/2020 | P | PASS |
Jim Storey
|
|
|
|
PubWorks Occupancy Approval | 4/28/2020 | 4/28/2020 | 4/28/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage (including roof drainage connection to the subdivision system and stabilization) is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Other | 2/10/2020 | 2/11/2020 | 2/11/2020 | A | PASS |
Tony Young
|
|
|
Dennis Phone #: ###-####// soffits,, work in progress,, ok
|
BLD-Wall Bracing | 2/7/2020 | 2/10/2020 | 2/10/2020 | P | PART |
Tony Young
|
|
|
Dennis Phone #: ###-####,, interior work in progress,, ok
|
BLD-Energy code compliance | 1/31/2020 | 2/3/2020 | 2/3/2020 | P | PASS |
Tony Young
|
|
|
Dennis Phone #: ###-####
|
BLD-Framing/Rough-in | 1/29/2020 | 1/30/2020 | 1/31/2020 | P | PASS |
Dave Hannah
|
|
|
Dennis Phone #: ###-####
|
BLD-Wall Bracing | 1/2/2020 | 1/2/2020 | 1/2/2020 | P | PASS |
Dave Hannah
|
|
|
lance Phone #: ###-####
|
BLD-Conference | 12/23/2019 | 12/23/2019 | 12/23/2019 | P | PEND |
Tony Young
|
|
|
verify rear setbacks,, measures 15 foot from wood frame to existing fence sent photos to Tom in Code enforcement
|
BLD-Footing | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | PASS |
Tony Young
|
|
|
rebar/viber barrier- Ryan Phone #: ###-####. interior footings in basement slab ok,, vapor barrior in place
|
BLD-Foundation | 10/22/2019 | 10/23/2019 | 10/23/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progres...
|
PubWorks Subgrade Approval | 10/21/2019 | 10/21/2019 | 10/21/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 10/17/2019 | 10/18/2019 | 10/18/2019 | A | PART |
Tell Riley
|
|
|
Ryan Phone #: ###-####//garage and crawl footings//setbacks per plans//footing per plan//
|
BLD-Footing | 9/26/2019 | 9/27/2019 | 9/27/2019 | A | PASS |
Tony Young
|
|
|
Brain Phone #: ###-####,, last section of footing/ wall ok
|
BLD-Foundation | 9/20/2019 | 9/23/2019 | 9/23/2019 | A | PART |
Tell Riley
|
|
|
Ryan-wall Phone #: ###-####//basement only//will need to call in for remainder of foundation//
|
BLD-Footing | 9/12/2019 | 9/13/2019 | 9/13/2019 | A | PART |
Jim Storey
|
|
|
Ryan Phone #: ###-#### rebar/ft west end ok
|
Plan Reviewer's activity | | | 9/13/2019 | | DONE |
Jenny Nelson
|
|
|
Talked to Dennis Geis, engineer shortening height of a few foundation walls to conform with land on site, not changing structure at all. Said to talk to inspector. Already did foundation inspection, if inspector thinks needs plan mod then we can do one.
|
PubWorks Subgrade Approval | 9/11/2019 | 9/11/2019 | 9/11/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 8/26/2019 | | |
|
|
|
|
OVERRIDE | | | 8/23/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 7/29/2019 | 7/29/2019 | 8/23/2019 | | DONE |
Jenny Nelson
|
|
|
08/15 sfd L2 Paper, 8/13 skipped planning and mech during routing, waiting for those reviews to be finished
|
Routing PW Grading-Hillside | 8/13/2019 | | 8/23/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.
|
Routing - PUBLIC WORKS | 8/13/2019 | | 8/23/2019 | | PASS |
Angela Hardy
|
|
|
|
Case Summary (BLD) | | | 8/23/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/23/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 8/23/2019 | | DONE |
|
|
|
ALL MET- Need
RP
Applicant needs to sign application and checklist and uploaded it
|
Inspection Record Card- Bld | | | 8/23/2019 | | DONE |
|
|
|
|
Routing - MECHANICAL | 8/13/2019 | | 8/15/2019 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 8/13/2019 | 8/13/2019 | 8/13/2019 | | PASS |
Lee G Meredith
|
|
|
Sprinklers are required.
|
1st review completed | | | 8/13/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 8/13/2019 | | 8/13/2019 | | PASS |
Jenny Nelson
|
|
|
|
Routing - MECHANICAL | | | 8/13/2019 | | FAIL |
|
|
|
Emailed corrections to designer
|
Routing - PLANNING | | | 8/13/2019 | | PASS |
|
|
|
Approved per CFH19-00043
|
Routing - FIRE | 8/9/2019 | | 8/12/2019 | | FAIL |
Lee G Meredith
|
|
|
08/09-2249 N Longview 404 Paper RESIDENTIAL. LGM
Inadequate fire flow at hydrant. Resubmittal with sprinklers required
|
Plan resubmittals received | | | 8/9/2019 | | DONE |
|
|
|
Three copies of each grading plans C1 and C1.1 stamped and taken to plan reivewer
|
Routing - Erosion and Sediment | 8/7/2019 | | 8/9/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Certified RP listed. Site preparation inspection is required.
|
Routing PW Grading-Hillside | 7/30/2019 | | 8/6/2019 | | FAIL |
Melissa Jannusch
|
|
|
see e-mail to applicant
|
Route to Impact Fee Review | 7/29/2019 | 8/1/2019 | 7/30/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | | | 7/30/2019 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 7/29/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/29/2019 | | DONE |
|
|
|
|
Intake Approval | | | 7/29/2019 | | PASS |
|
|
|
|
Application received | | 7/29/2019 | | | |
|
|
|
|
Routing - PUBLIC WORKS | 7/29/2019 | | | | FAIL |
|
|
|
SEE HILLSIDE FOR FAIL
|