BLD-Wall Bracing | 7/17/2020 | 7/20/2020 | 7/20/2020 | A | NR |
Mike Jordan
|
|
|
Brian- */Screened*/ Phone #: ###-####. Building footprint has been altered. Home owner to resubmit new floorplan and braced wall plan to engineer for approval.
|
BLD-Footing | 5/21/2020 | 5/22/2020 | 5/22/2020 | A | PASS |
Brandon Shaw
|
|
|
Work in progress....
|
OVERRIDE | | | 9/17/2019 | | |
|
|
|
|
Routing Walk-In (BLD) | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 8/8/2019 | 8/8/2019 | 9/17/2019 | | PASS |
Josh Bogle
|
|
|
08/13 garage, paper - 1st done
|
Routing - PLAN CHECK | 9/17/2019 | | 9/17/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/17/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/17/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/17/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Permit Ready to Issue | | | 9/17/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/17/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/16/2019 | | 9/16/2019 | | FAIL |
Josh Bogle
|
|
|
missing some construction details
|
Routing - PLAN CHECK | 8/13/2019 | | 8/13/2019 | | FAIL |
Josh Bogle
|
|
|
still needs Tall-Wall & Lateral engineering
|
Plan resubmittals received | | | 8/7/2019 | | DONE |
|
|
|
Two copies of new full set of plans stamped and take to plan reviewer.
|
Routing Walk-In (Zoning) | 7/29/2019 | 7/29/2019 | 7/29/2019 | P | PASS |
Jeff Lowe
|
|
|
shower not approved with this permit. driveway to be separated by 5-foot landscape buffer.
|
Routing Walk-In (BLD) | 7/29/2019 | 7/29/2019 | 7/29/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/29/2019 | | 7/29/2019 | | FAIL |
Josh Bogle
|
|
|
needs engineering for tall wall & lateral
|
1st review completed | | | 7/29/2019 | | FAIL |
Josh Bogle
|
|
|
|
Meeting | | | 7/29/2019 | | DONE |
|
|
|
Todd is the new Parcel owner, I informed him will need a copy of the warranty deed for proof of ownership before building permit can be issued.
(UPDATE: WARRANTY DEED PROVIDED, SEE ATTACHED DOCUMENT)
|
Application received | | 7/29/2019 | | | |
|
|
|
|