First Notice | 1/3/2020 | 1/3/2020 | 1/13/2020 | | DONE |
Tell Riley
|
|
|
This permit finaled on the web by Brian McCoy
|
BLD-Final | 1/3/2020 | 1/3/2020 | 1/3/2020 | P | PASS |
Tell Riley
|
|
|
Tom Phone #: ###-####//Site asbuilt inspection completed and signed and sealed approval letter provided by design Engineer//no mechanical due to plan mod and no changes to mechanical//no plumbing due to plan mod and no changes to existing plumbing//
|
DOC - Permit Finaled | 1/3/2020 | 1/3/2020 | 1/3/2020 | P | PASS |
Tell Riley
|
|
|
|
FIRE-Final Inspection | 12/30/2019 | 12/30/2019 | 12/30/2019 | P | PASS |
Jim Page
|
|
|
No fire sprinkler modifications, no fire alarm modificaitons, final life fire safety inspection for vanilla TI complete, signatures provided on permit sign off card. As noted it project description, no occupancy allowed under this permit.
Tom Phone #: ###-####
|
BLD-Final | 12/30/2019 | 12/30/2019 | 12/30/2019 | P | NR |
Tell Riley
|
|
|
Tom Phone #: ###-####//need special isnpection report//talked with Tom, may need to have pull test as no specials were completed, he will talk with design engineer//
|
CHANGE STATUS TO (ISS) | | | 12/20/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/16/2019 | | DONE |
|
|
|
plan mod approved
|
Plan assigned to (M_H) | 11/25/2019 | | 12/16/2019 | | DONE |
Michael Hanson
|
|
|
plan mod
|
Routing - PLAN CHECK | 11/26/2019 | | 12/16/2019 | | PASS |
Michael Hanson
|
|
|
PLAN MOD REVIEW FEE = 1 HOUR
|
Routing - Addressing | 11/29/2019 | | 12/4/2019 | | PASS |
Doug Chausow
|
|
|
Corrected address: 3363 N Five Mile Rd
|
Routing - PUBLIC WORKS | 11/29/2019 | | 12/3/2019 | | PASS |
Morgan Webb
|
|
|
NO NEW PLUMBING
|
Plan Modification Accepted | | | 11/25/2019 | | DONE |
|
|
|
Jeff Likes from ALC Architecture requested to start a plan mod workflow to update address on sheets G1.1, A1.1, and A4.1
|
BLD-Energy code compliance | 11/5/2019 | 11/6/2019 | 11/6/2019 | A | PASS |
Tell Riley
|
|
|
Tom Phone #: ###-####//framing and insulation//
|
BLD-Framing/Rough-in | 10/30/2019 | 10/31/2019 | 10/31/2019 | A | DONE |
Dave Hannah
|
|
|
shear // Tom Phone #: ###-####
|
BLD-Wall Bracing | 10/30/2019 | 10/31/2019 | 10/31/2019 | A | PASS |
Dave Hannah
|
|
|
shear // Tom Phone #: ###-#### back ext wall ok to insulate
|
BLD-Framing/Rough-in | 10/29/2019 | 10/30/2019 | 10/30/2019 | A | PART |
Tell Riley
|
|
|
Tom Phone #: ###-####//need to add blocks and nailing to shear in back wall//front new store front ok//no trades to be installed//
|
CHANGE STATUS TO (ISS) | | | 10/23/2019 | | DONE |
|
|
|
plan mod
|
Plan assigned to (M_H) | 9/17/2019 | | 10/21/2019 | | DONE |
Michael Hanson
|
|
|
1st plan mod review completed - 10/01 plan mod - Vanilla T.I.
|
Routing - PLAN CHECK | 10/21/2019 | | 10/21/2019 | | PASS |
Michael Hanson
|
|
|
PLAN MOD PASS 2 HOUR PLAN MOD REVIEW FEE
|
Permit Ready to Issue | | | 10/21/2019 | | DONE |
|
|
|
PLAN MOD
|
Routing - PLAN CHECK | 10/16/2019 | | 10/16/2019 | | FAIL |
Michael Hanson
|
|
|
Plan modification fail see changemarks in ePlan for corrections required.
|
Routing - PUBLIC WORKS | 9/25/2019 | | 9/25/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Design Review | 9/24/2019 | | 9/24/2019 | | PASS |
Katelyn Menuge
|
|
|
DRH19-00300
|
Routing - Addressing | 9/24/2019 | | 9/24/2019 | | PASS |
Doug Chausow
|
|
|
Ste 100
|
Intake Approval | | | 9/19/2019 | | FAIL |
Michael Hanson
|
|
|
Plan mod intake fail
Floorplan and enlarged bathroom sheet do not match. Show floor sink on floor plan and provide reference to the enlarged bathroom sheet on the floorplan.
|
Route to Impact Fee Review | 9/17/2019 | 9/20/2019 | 9/18/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Plan Modification Accepted | | | 9/17/2019 | | DONE |
|
|
|
plan mod requested by Jeff Likes per email to combined the two vanilla suites into one
|
Issue PAID IN FULL permit | | | 9/12/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/12/2019 | | |
|
|
|
|
Meeting | | | 9/11/2019 | | DONE |
|
|
|
emailed shy back informing her we need a revised value for both suite numbers
|
Plan assigned to (M_H) | 8/1/2019 | | 8/19/2019 | | DONE |
Michael Hanson
|
|
|
08/13 #518 L2 ePlan - Vanilla - pending fire review
|
Routing - FIRE | 8/1/2019 | 8/1/2019 | 8/13/2019 | | PASS |
Mark Scharfen
|
|
|
08.13-completed fire review. Uploaded rev_fire 08.13.2019.pdf
|
1st review completed | | | 8/13/2019 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/13/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/13/2019 | | DONE |
|
|
|
DO NOT ISSUE WITHOUT BLD19-02923 (need value as of 9-11)
MET (office@sl-builders.com)
GC FORM
REVISED VALUE
|
Routing - Addressing | 8/1/2019 | | 8/7/2019 | | PASS |
Doug Chausow
|
|
|
Please sign off in Tidemark BLD19-02923
|
Routing - PLAN CHECK | 8/1/2019 | | 8/6/2019 | | PASS |
Michael Hanson
|
|
|
|
Routing - PUBLIC WORKS | 8/1/2019 | | 8/1/2019 | | PASS |
Angela Hardy
|
|
|
Please sign off in Tidemark BLD19-02923
|
Routing - Design Review | 8/1/2019 | | 8/1/2019 | | PASS |
Andrea Tuning
|
|
|
Please sign off in Tidemark BLD19-02923
|
Intake Approval | | | 7/31/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 7/30/2019 | | FAIL |
Michael Hanson
|
|
|
This permit has failed prescreen due to the following:
1. Complete #310 from with owner information, signature, and date
|
Application received | | | 7/29/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 29 2019 3:55PM
|