BLD-Final | 12/2/2019 | 12/3/2019 | 12/3/2019 | A | PASS |
Tell Riley
|
|
|
Katie Phone #: ###-####//corrections made final complete//
|
DOC - Permit Finaled | 12/3/2019 | 12/3/2019 | 12/3/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 11/27/2019 | 11/27/2019 | 11/27/2019 | P | CANC |
Tell Riley
|
|
|
Office number Phone #: ###-####//not ready//CN still poste//
|
BLD-Final | 11/20/2019 | 11/21/2019 | 11/21/2019 | A | FAIL |
Tell Riley
|
|
|
Katie Phone #: ###-####//CN issued for steps, crossover connection covers and backfill onsite//
|
BLD-Foundation | 10/24/2019 | 10/25/2019 | 10/25/2019 | A | PART |
Tell Riley
|
|
|
late morning-Kyle Phone #: ###-####//wall rebar per plans//vents installed// wip
|
BLD-Conference | 10/24/2019 | 10/24/2019 | 10/24/2019 | P | DONE |
Tell Riley
|
|
|
met onsite with GC over setbacks//no pins were located--looks to be in location of prior MH based on Google images and parcel data//talked with Bob and discussed situation//should be fine to continue//
|
BLD-Footing | 10/21/2019 | 10/23/2019 | 10/23/2019 | A | PART |
Tell Riley
|
|
|
KYLE Phone #: ###-####//signed card ok per plans//still working on rebar verts and hold downs// will be getting in before pour//
|
BLD-Footing | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | CANC |
Tell Riley
|
|
|
Kyle Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/12/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/12/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 8/30/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 8/8/2019 | 8/8/2019 | 8/30/2019 | | PASS |
Josh Bogle
|
|
|
08/14 man home, ePlan - 1st done
|
Routing - PLAN CHECK | 8/30/2019 | | 8/30/2019 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/30/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Permit Ready to Issue | | | 8/30/2019 | | DONE |
|
|
|
all met
Need:
GC FORM (or clarify how Clayton Homes and TV Group LLC are affiliated)
MET
RP
SEWER PLUG
|
Routing - PLANNING | 8/22/2019 | | 8/22/2019 | | PASS |
Sue Cummings
|
|
|
Received site plan 8/22/19
|
1st review completed | | | 8/13/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/8/2019 | | 8/13/2019 | | FAIL |
Josh Bogle
|
|
|
no review pending Planning approval
|
Routing - PLANNING | 8/8/2019 | | 8/8/2019 | | FAIL |
Sue Cummings
|
|
|
Need a site plan please
|
Routing - Addressing | 8/8/2019 | | 8/8/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/8/2019 | | 8/8/2019 | | PASS |
Morgan Webb
|
|
|
|
Telephone call | | | 8/8/2019 | | DONE |
|
|
|
done-called again to let Katie know we need the correct GC #/name- talked to Domigo (?) again-the one on the app does not match the names on the app-also that we need the valuation for the foundation and the demo only-i removed the valuation in here as well as the fee until we get the revised from Katie
|
Intake Approval | | | 8/8/2019 | | PASS |
|
|
|
called Katie-need new valuation, correct RCE # but don't wan tto hold up her permit any longer for review
|
Recd Pcfee & Taken To Pln CK | | | 8/8/2019 | | DONE |
|
|
|
no fees paid at intake
|
Intake Approval | | | 8/7/2019 | | FAIL |
|
|
|
After looking at everything that was submitted, we noticed that not all the documents and drawings were facing the correct way and not all items in the drawings folder were individual sheets. We have deleted everything but the application. Can you please re upload all drawings in the drawings folder separately and in correct orientation for which they are formatted (landscape vs. portrait) and all documents in the documents folder in the correct orientation.
Please see our submittal standards for Eplan using the link below if you have any questions.
https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
|
Telephone call | | | 8/7/2019 | | DONE |
|
|
|
called talked to Domingo--left message that we need the correct RCE#-the one they gave belongs to another company-also have quesions about the valuations-everything has been resolved for this phone call
|
Intake Approval | | | 8/6/2019 | | FAIL |
|
|
|
all drawings need to be turned the correct way (landscape) and uploaded individually, bottom right corner needs to be left empty for out approval stamp. All drawings need to go in the drawings folder and all documents need to go into the document folder.
|
Route to Impact Fee Review | 7/29/2019 | 8/1/2019 | 7/30/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Application received | | | 7/29/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 29 2019 4:00PM
|