Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD19-02893
StatusFinaled
Name BLACKROCK HOMES LLC
Site Address 1507 S BOULDER VIEW LN
Project Name66-1 WSV1
Customer NumberGATE CITY
ePlanReviewYes
Description
**W.U.I. FOOTHILLS ZONE A CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR SIDING REQUIRED****PASSES USING UA TRADE OFF** Permit for the construction of a new 2567 sq. ft., one story single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 278 sq. ft. of covered patio/porch and a 981 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. JJN ***SPRINKLERS ARE NOT REQUIRED.***LGM A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/25/20206/25/20206/25/2020PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
DOC - Permit Finaled6/25/20206/25/20206/25/2020PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results6/25/20206/25/20206/25/2020PDONE
DetailsBrandon Shaw
ACH50- 3.55
BLD-Energy code compliance4/17/20204/21/20204/21/2020APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in4/13/20204/17/20204/17/2020APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Wall Bracing3/11/20203/11/20203/11/2020PPASS
DetailsBrandon Shaw
Jorge Phone #: ###-####
BLD-Foundation11/4/201911/5/201911/5/2019APASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing10/31/201911/1/201911/1/2019APASS
DetailsBrandon Shaw
Work in progress...
PubWorks Subgrade Approval10/31/201910/31/201910/31/2019 DONE
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  10/17/2019 DONE
Inspection Record Card- Bld  10/17/2019 DONE
OVERRIDE  8/7/2019  
Plan assigned to (J_N)7/30/20197/30/20198/7/2019 DONE
DetailsJenny Nelson
08/16 sfd L2 ePlan. 1st complete 08/06, need shear calculations
Routing - PLAN CHECK8/7/2019 8/7/2019 PASS
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  8/7/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  8/7/2019 DONE
MET
1st review completed  8/6/2019 DONE
DetailsJenny Nelson
Routing - PLAN CHECK7/30/2019 8/6/2019 FAIL
DetailsJenny Nelson
Need shear calculations
Route to Impact Fee Review7/30/20198/2/20197/31/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Routing - FIRE7/30/20197/30/20197/31/2019 PASS
DetailsLee G Meredith
08/12-1507 S Boulder View RES ePlan LGM

Sprinklers are not required.
Routing - MECHANICAL7/30/2019 7/31/2019 PASS
DetailsTroy James
Routing - Addressing7/30/2019 7/31/2019 PASS
DetailsDoug Chausow
Application received  7/30/2019 DONE
Application submitted via PDS Online on Jul 30 2019 2:16PM
Plans ACCEPTED BY PLAN TECH  7/30/2019 DONE
Intake Approval  7/30/2019 PASS
Override - Parcel Holds  7/30/2019  
Recd Pcfee & Taken To Pln CK  7/30/2019 DONE
Routing - PUBLIC WORKS7/30/2019 7/30/2019 PASS
DetailsMorgan Webb
Routing - PLANNING7/30/2019 7/30/2019 PASS
DetailsSue Cummings