BLD-Final | 1/30/2020 | 1/30/2020 | 1/30/2020 | P | PASS |
Jim Storey
|
|
|
Daniel Phone #: ###-####
|
DOC - Permit Finaled | 1/30/2020 | 1/30/2020 | 1/30/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | PART |
Tell Riley
|
|
|
Daniel Phone #: ###-####//still needs address # posted//electrical outlet near side door needs cover//steback issue ok per zoning//
|
BLD-Final | 1/13/2020 | 1/13/2020 | 1/13/2020 | P | FAIL |
Tell Riley
|
|
|
daniel Phone #: ###-####//CN posted//Setbacks have not been verified and no property pins are visible-talked with contractor on 8/2/2019 about this//sub panel and wires on ground at heat pump hook up//need to install house number// mechanical permit will be needed if heat pump to be installed//
|
BLD-Conference | 8/2/2019 | 8/2/2019 | 8/2/2019 | P | NR |
Tell Riley
|
|
|
Daniel ###-####//still need to verify setbacks of 15' on five mile side// currently 6 feet from fence and 15' from curb line// no pins//
|
BLD-Other | 7/30/2019 | 7/31/2019 | 7/31/2019 | A | FAIL |
Tell Riley
|
|
|
Block and Tie // Daniel Phone #: ###-####//need electrical inspection//setbacks per zoning will require 15' on Five Mile side--please mark property line//
|
Route to Impact Fee Review | 7/30/2019 | 8/2/2019 | 7/31/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Permit Ready to Issue | | | 7/30/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/30/2019 | | DONE |
|
|
|
|
Application received | | 7/30/2019 | | | |
|
|
|
|