BLD-Final | 10/28/2019 | 10/30/2019 | 10/30/2019 | P | PASS |
Tell Riley
|
|
|
Glen Phone #: ###-####//final complete per plans//advised to get heater in bathroom//
|
DOC - Permit Finaled | 10/30/2019 | 10/30/2019 | 10/30/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | FAIL |
Tell Riley
|
|
|
Glenn Phone #: ###-####//need fascia completed at addition//cannot duct heat from home to garage space//obtain mechanical permit for exhaust fan//
|
BLD-Energy code compliance | 9/19/2019 | 9/20/2019 | 9/20/2019 | A | PASS |
Tell Riley
|
|
|
Glen Phone #: ###-####
|
BLD-Framing/Rough-in | 9/18/2019 | 9/19/2019 | 9/19/2019 | A | PASS |
Tell Riley
|
|
|
corrections made//2 trusses need bearing points changed--get engineering// will check at insulation//
|
BLD-Framing/Rough-in | 9/16/2019 | 9/19/2019 | 9/18/2019 | A | PART |
Tell Riley
|
|
|
Glen Phone #: ###-####//need truss plans and engineering//add nails and straps at portal frame as discussed on shear inspection//ok to insulate walls only//
|
BLD-Wall Bracing | 9/16/2019 | 9/17/2019 | 9/17/2019 | A | PASS |
Tell Riley
|
|
|
Glen Phone #: ###-####//add nails as discussed and straps per plan//will check at framing//
|
BLD-Foundation | 8/28/2019 | 8/29/2019 | 8/29/2019 | A | PART |
Tell Riley
|
|
|
Jeremy Phone #: ###-####//WIP//ok to pour when ready//
|
BLD-Footing | 8/27/2019 | 8/28/2019 | 8/28/2019 | A | PASS |
Tell Riley
|
|
|
Jeremy Phone #: ###-####//footings installed per plans//
|
Routing Walk-In (Zoning) | 7/31/2019 | 7/31/2019 | 7/31/2019 | A | PASS |
Jeff Lowe
|
|
|
bathroom internal to site. no ADU propsed/approved with this permit. maintain 3-ffot wide buffer along driveway
|
Routing Walk-In (BLD) | 7/31/2019 | 7/31/2019 | 7/31/2019 | A | DONE |
Rob Patrick
|
|
|
|
Plan assigned to (RDP) | 7/31/2019 | 7/31/2019 | 7/31/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/31/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 7/31/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/31/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/31/2019 | | 7/31/2019 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 7/31/2019 | | DONE |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 7/31/2019 | | DONE |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 7/31/2019 | | DONE |
Rob Patrick
|
|
|
|
Application received | | 7/31/2019 | | | |
|
|
|
|