Permit Information
Permit NumberBLD19-02932
StatusFinaled
Name GARCIA GRACIELA
Site Address 2709 N MAPLE GROVE RD
Project NameGarcia Addition
Customer Number 
ePlanReviewNo
Description
Permit for a 310sq' addition to a manufactured home that adds a bedroom. All work per plans, notations, engineering, local codes & ordinances. Separate electrical mechanical permit required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/2/20206/3/20206/3/2020APASS
DetailsDave Hannah
Gaciela Phone #: ###-####
DOC - Permit Finaled6/3/20206/3/20206/3/2020PPASS
DetailsDave Hannah
BLD-Final3/30/20203/31/20203/31/2020ANR
DetailsTell Riley
Graciela Phone #: ###-####//need to add smoke detectors outside bedrooms on on each end of home//need steps out the bedroom door//
BLD-Energy code compliance3/2/20203/3/20203/3/2020PPASS
DetailsDave Hannah
Graciela Phone #: ###-####
BLD-Energy code compliance3/2/20203/2/20203/2/2020PNR
DetailsDave Hannah
gRACIELA Phone #: ###-#### needs to add one more layer of r19 in attic
BLD-Framing/Rough-in2/28/20202/28/20202/28/2020PPASS
DetailsJim Storey
Graciela Phone #: ###-####
BLD-Framing/Rough-in2/24/20202/24/20202/24/2020PNR
DetailsTell Riley
Graciela Phone #: ###-####//need to add studs at plate breaks near center door//need mechanical inspection//need electrical inspection//do not insulate until framing is approved//
BLD-Conference1/27/20202/3/20202/3/2020PDONE
DetailsTell Riley
Graciela Phone #: ###-####//shear ok//truss issues were discussed//
Routing Walk-In (BLD)1/27/20201/27/20201/27/2020APASS
DetailsJosh Bogle
BLD-Framing/Rough-in1/22/20201/23/20201/23/2020PFAIL
DetailsTell Riley
Graciela Phone #: ###-####//needed shear--failed--discussed onsite//CN issued//will need plan mod for moved wall or meet plans//roof framing does not meet plans either//
Routing Walk-In (BLD)12/4/201912/4/201912/4/2019PPASS
DetailsJosh Bogle
question on adding to the addition
BLD-Foundation11/25/201911/26/201911/26/2019APASS
DetailsTell Riley
Graciela Phone #: ###-####//ok--left cold weather guide--blankets onsite//
BLD-Foundation11/21/201911/22/201911/22/2019APASS
DetailsTell Riley
Victor Phone #: ###-####//per plans//footings only//
Plan Reviewer's activity  10/15/2019 DONE
DetailsJavier Guzman
I was called to the front to find out what Mrs. Garcia needed as she only spoke spanish, what she wanted was to enlarge the room addition of the project but I told since the room addition to the mobile home was designed by an engineer she would need to get from the engineer revised plans
Routing Walk-In (BLD)10/14/201910/14/201910/14/2019PFAIL
DetailsJosh Bogle
Needs Engineering for RV Carport
Issue PAID IN FULL permit  10/14/2019 DONE
Routing Walk-In (Zoning)8/1/20198/1/20198/1/2019PPASS
DetailsEthan Mansfield
Routing Walk-In (BLD)8/1/20198/1/20198/1/2019PDONE
DetailsJosh Bogle
Routing - PLAN CHECK8/1/2019 8/1/2019 PASS
DetailsJosh Bogle
1st review completed  8/1/2019 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  8/1/2019 PASS
DetailsJosh Bogle
Case Summary (BLD)  8/1/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  8/1/2019 DONE
DetailsJosh Bogle
ESC no - Energy yes
Permit Ready to Issue  8/1/2019 DONE
will be back later to pick up
Application received 8/1/2019