(F) Reprint permit | | | 9/25/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/20/2019 | | DONE |
|
|
|
|
Plan assigned to (JG) | 8/28/2019 | 8/28/2019 | 8/28/2019 | | PASS |
Javier Guzman
|
|
|
Zagg
|
1st review completed | | | 8/28/2019 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/28/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/28/2019 | | DONE |
|
|
|
all met: jack@nbikiosks.com
Need GC
Need Rev Val
|
Routing - PLAN CHECK | 8/21/2019 | | 8/28/2019 | | PASS |
Javier Guzman
|
|
|
08/23 L1 ZAGG KIOSK AT BOISE TOWN SQ. ePlan*
|
Intake Approval | | | 8/19/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 8/16/2019 | | FAIL |
Brian McGowan
|
|
|
Please address the following for your Prescreen to be approved;
1. Sheets A3.0 and A3.1 need to be rotated and resubmitted.
2. Please verify that your Product Specifications are updated to the 2015 ICC or 2015 IBC. Several Sheets note the 2006 IBC and even the UBC as the Code.
3. Sheet A0.0 does not have the required area for the City of Boise Approval stamp.
|
Intake Approval | | | 8/14/2019 | | FAIL |
Brian McGowan
|
|
|
Please address the following for your Prescreen to be approved;
1. Plan Sheets must be a minimum 18"x24".
2. Please verify that your Product Specifications are updated to the 2015 ICC or 2015 IBC
3. Sheet A0.0 does not have the required area for the City of Boise Approval stamp. Please provide this for each plan sheet.
4. Please provide the Boise Tiwne Square Approval letter.
|
Application received | | | 8/1/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 1 2019 4:57PM
|
BLD-Aging Inspection | 8/5/2020 | 8/5/2020 | | | |
Mike Jordan
|
|
|
|