Permit Information
Permit NumberBLD19-02939
StatusFinaled
Name CARROLL CONSTRUCTION
Site Address 8650 W HACKAMORE DR
Project NameShadows
Customer Number 
ePlanReviewYes
Description
(SHADOWS) //1-23-2020 PLAN MODIFICATION TO EQUIPMENT LAYOUT, MECHANICAL AND ELECTRICAL WORK. Jg// Permit to construct a new 11,145 sq. ft. one story building and related site work. Scope of work includes: construction of footing foundation, slab on grade concrete floor, 8” CMU exterior walls, steel roof joist, electrical work and site work. This building is not fire sprinkled. Note: special inspection required see attached form #310. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 5/31/20207/9/2020 DONE
mailed 7-9-2020
Permanent Occupancy  5/21/2020 DONE
BLD-Final5/14/20205/15/20205/15/2020PPASS
DetailsMike Jordan
Phone #: 2085591460 >> Inspection requested via mobile web by Aaron Carroll. Ok for perm occ.
Temporary Occupancy5/8/20208/6/20205/8/2020 DONE
DetailsGabe Brenner
BLD-Final4/29/20204/30/20204/30/2020APART
DetailsMike Jordan
Call for access Phone #: 2085591460 >> Inspection requested via mobile web by Aaron Carroll. Ok for temp. occ. Noted vertical grab bars not within the 39 to 41 inch.
FIRE-Final Inspection4/29/20204/30/20204/30/2020APASS
DetailsTroy Cobbley
Life safety passed. Phone #: 2085591460 >> Inspection requested via mobile web by Aaron Carroll
FIRE-Final Inspection4/30/20204/30/20204/30/2020PPASS
DetailsTroy Cobbley
life safety passed.

Phone #: 2085591460 >> Inspection requested via mobile web by Aaron Carroll
FIRE-Final Inspection4/28/20204/29/20204/29/2020PFAIL
DetailsTroy Cobbley
Still need the emergency lights repaired for a life safety final.

Screened-ARMANDO Phone #: ###-####
Zoning Approval4/29/20204/29/20204/29/2020 PASS
DetailsJosh Wilson
FIRE-Final Inspection4/27/20204/28/20204/28/2020AFAIL
DetailsTroy Cobbley
Provide small documents, provide address as discussed, repair emergency lights as marked on the city approved plans.

*screened* Armando Phone #: ###-####
BLD-Ceiling Grid Inspection4/15/20204/16/20204/16/2020APASS
DetailsMike Jordan
*screened* Amando Phone #: ###-####
BLD-Energy code compliance3/10/20203/10/20203/10/2020PPASS
DetailsMike Jordan
Armando Phone #: ###-####
BLD-Framing/Rough-in3/6/20203/6/20203/6/2020PPASS
DetailsMike Jordan
armando Phone #: ###-####. Interior steel stud framed walls ok.
CHANGE STATUS TO (ISS)  2/11/2020 DONE
PLAN MOD APPROVED- DO NO RE ISSUE
BLD-Other2/6/20202/6/20202/6/2020PDEFR
DetailsMike Jordan
roof before cover // Armando Phone #: ###-####. Ok to cover pending special inspection.
OVERRIDE  2/5/2020  
Plan assigned to (JG)1/21/20201/21/20202/5/2020 PASS
DetailsJavier Guzman
01/30 Plan Mod Intrastar ePlan
Telephone call  2/5/2020 DONE
no building plan reviewer fee for the plan mod that was submitted on 1/21/20 per Carl Madsen
Permit Ready to Issue  2/5/2020 DONE
DO NOT RE ISSUE- plan mod approved
Routing - FIRE1/23/20201/23/20202/4/2020 PASS
DetailsMark Stumbaugh
01/30 Plan Mod Intrastar ePlan
Routing - PLAN CHECK1/23/2020 2/3/2020 PASS
DetailsJavier Guzman
Routing - MECHANICAL1/23/2020 1/27/2020 PASS
DetailsTroy James
Added screen printing tool
BLD-Framing/Rough-in1/22/20201/23/20201/23/2020APASS
DetailsMike Jordan
Armando Phone #: ###-####. Exterior sheathing ok. Verified sheeting is fire treated.
Plan Modification Accepted  1/21/2020 DONE
Modifications to equipment plan including new mechanical and electrical work.
BLD-Framing/Rough-in1/17/20201/17/20201/17/2020PPASS
DetailsMike Jordan
armando Phone #: ###-####. Exterior steel stud walls and roof for compressor room ok to shaeet.
BLD-Other1/8/20201/9/20201/9/2020APART
DetailsMike Jordan
Armando- massory inspection Phone #: ###-####. Work in progress on south east corner of masonry wall at 8ft. to 12ft. elevation. Ok for grout pending special inspection.
BLD-Concrete12/13/201912/16/201912/16/2019ADEFR
DetailsMike Jordan
Aramado- pouring concrete please as early as possible Phone #: ###-####. Work in progress. Ok to grout pending special inspection.
BLD-Foundation11/27/201912/3/201912/3/2019PPASS
DetailsMike Jordan
rebar // Armando Phone #: ###-####. Interior slab on grade.
BLD-Footing11/18/201911/19/201911/19/2019APART
DetailsMike Jordan
Armando Phone #: ###-####. West stemwall, work in progress. Ok to place concrete pending special inspection.
BLD-Foundation11/14/201911/15/201911/18/2019APASS
DetailsDave Hannah
rebar // armondo Phone #: ###-####
BLD-Foundation11/6/201911/8/201911/8/2019PPEND
DetailsDave Hannah
rebar // Armando Phone #: ###-#### this is a ftg inspection looks good but not done spec inspection will sign off monday befor placement
OVERRIDE  10/23/2019  
Route to Impact Fee Review10/22/201910/25/201910/23/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan assigned to (JG)8/13/20198/16/201910/23/2019 PASS
DetailsJavier Guzman
10/23 3rev, 09/23 - 502 Intrastar (71 pages)
Routing - Erosion and Sediment10/23/2019 10/23/2019 PASS
DetailsAndy J. Long
VOID. See ESC permit issued with GRD permit, ESC19-01049
Issue PAID IN FULL permit  10/23/2019 DONE
(F) Reprint permit  10/23/2019 DONE
Print Occupancy Form  10/23/2019 DONE
Routing - PLAN CHECK10/22/2019 10/23/2019 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  10/23/2019 DONE
Permit Ready to Issue  10/23/2019 DONE
**let applicant know that he needs to email Tisha a request for refund for ESC19-01055
ALL MET-
Need GC
Need Rev Val
met: Need RP see ESC19-01049
Routing - Design Review10/22/2019 10/22/2019 PASS
DetailsJosh Wilson
Routing - PLAN CHECK10/8/2019 10/15/2019 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL10/8/2019 10/15/2019 PASS
DetailsJavier Guzman
signed off in ePlan by KPFF engineer
Routing - Design Review10/8/2019 10/11/2019 PASS
DetailsJosh Wilson
Routing - PLANNING10/8/2019 10/10/2019 PASS
DetailsDavid Moser
Routing PW Sewer Design10/8/2019 10/8/2019 PASS
DetailsDeAnn Brown
1st review completed  9/30/2019 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK8/16/2019 9/30/2019 FAIL
DetailsJavier Guzman
Routing - FIRE8/13/20198/16/20199/23/2019 PASS
DetailsMark Stumbaugh
09/23 - 502 Intrastar
Routing PW Street Lights8/16/2019 9/20/2019 PASS
DetailsTom Marshall
Routing PW Sewer Design8/16/2019 9/20/2019 FAIL
DetailsDeAnn Brown
Label existing sewer manholes with City of Boise manhole numbers. Note on existing service that is not to be used currently, to protect and retain for future use.
Routing PW Solid Waste8/16/2019 9/20/2019 PASS
DetailsEvan Carpenter
Routing PW Environmental8/16/2019 9/20/2019 PASS
DetailsRick Christenson
On-Site BMP's for screen washout area
Routing Off Site - STRUCTURAL8/16/2019 9/19/2019 FAIL
DetailsJavier Guzman
Failed in ePlan by KPFF engineer
Routing PW Drainage8/16/2019 9/19/2019 PASS
DetailsBrian Murphy
Routing - MECHANICAL8/16/2019 8/22/2019 PASS
DetailsTroy James
Routing - Erosion and Sediment8/20/2019 8/20/2019 PASS
DetailsMichael Zawacki
RP needed.
Site prep inspection required after all BMPs installed and before any ground disturbing construction activities.
Routing - Addressing8/16/2019 8/20/2019 PASS
DetailsLaura Hunter
Routing - Design Review8/16/2019 8/19/2019 FAIL
DetailsAndrea Tuning
Obtain a Conditional Use Permit.

Provide a minimum of 37-parking stalls with a maximum of 14 of the spaces allowed to be compact or obtain a parking reduction that is reviewed and approved by the Boise City Planning and Zoning Commission.

Install 7 Class II or Class III trees along the west property line adjacent to the site’s drive aisle.
Routing - PLUMBING8/16/2019 8/19/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC
Routing - PLANNING8/16/2019 8/16/2019 FAIL
DetailsDavid Moser
need to ait for CUP approval (CUP19-00043)
Routing - PUBLIC WORKS8/16/2019 8/16/2019 PASS
DetailsMorgan Webb
Plan Reviewer's activity  8/13/2019 PASS
Plan intake review approved
Intake Approval  8/13/2019 PASS
DetailsCarl Westfall
Intake Approval  8/6/2019 FAIL
(8-6-19) Refer to the circled items in the Plan Intake Checklist. Resolve each item as directed. If you have a question, contact Carl J. Westfall at ###-####.
Intake Approval  8/6/2019 FAIL
(8-6-19) Upload the Conditional Use Approval. CJW
Application received  8/2/2019 DONE
Application submitted via PDS Online on Aug 2 2019 10:46AM