Permit Information
Permit NumberBLD19-02940
StatusFinaled
Name BARNES CONSTRUCTION LLC
Site Address 11621 W EXECUTIVE DR
Project NameCWallA interior remodel
Customer Number 
ePlanReviewNo
Description
(CWALLA) ***PLAN MOD TO REMOVE TWO EXTERIOR DOORS, EXITING IS WITHIN CODE REQUIREMENTS - MDH 09/13/2019*** This building is fire sprinkled for building area increase. Permit to demo an existing 1,131 sqft. existing office area within an existing warehouse. Final area is office 3,720 sq.ft. and warehouse 9,660 sq.ft. for a total of 13,380 sq.ft.. Work to include: remove non-load bearing interior walls, remove plumbing fixtures, remove millwork, constructing non-load bearing interior walls to cover windows, minor electrical work, minor plumbing work. Interior finishes shall be in compliance with Ch. 8 of the 2015 IBC. This building is fully fire sprinkled. Any alterations or modifications to the buildings fire sprinkler or fire alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise fire department. Seperate permit required for new racking over 8'-0". Restroom fixtures were evaluated using a ratio factor, third restroom not required. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  11/7/2019 DONE
First Notice 9/26/201910/25/2019 DONE
mailed 11-1-19
BLD-Final9/13/20199/16/20199/16/2019PPASS
DetailsMike Jordan
Sue- please call for access Phone #: ###-####
Permanent Occupancy  9/16/2019 DONE
Plan assigned to (M_H)9/5/2019 9/13/2019 DONE
DetailsMichael Hanson
09/11 plan mod Paper - CWallA
Routing - PLAN CHECK9/5/2019 9/13/2019 PASS
DetailsMichael Hanson
1 HOUR PLAN MOD FEE
Case Summary (BLD)  9/13/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  9/13/2019 DONE
plan mod
Telephone call  9/13/2019 DONE
spoke with duan informing plan mod is ready and fee amount due
CHANGE STATUS TO (ISS)  9/13/2019 DONE
plan mod change to ISS
Plan Modification Accepted  9/5/2019 DONE
2 man doors have changed. on s site no longer exists and one e side is covered on inside no longer a exit
BLD-Final9/3/20199/4/20199/4/2019PFAIL
DetailsMike Jordan
ask for Sue // Duane Phone #: ###-####. Needs to submit a updated floor plan showing the 2 exterior exit doors that have been removed.
FIRE-Final Inspection9/3/20199/4/20199/4/2019APASS
DetailsTroy Cobbley
life safety passed. Card signed.

ask for Sue // Duane Phone #: ###-####
Issue PAID IN FULL permit  8/20/2019 DONE
Plan assigned to (M_H)8/2/2019 8/19/2019 DONE
DetailsMichael Hanson
2nd review completed - 08/08 #518 L1 Paper - CWallA Demo Only
Routing - PLAN CHECK8/19/2019 8/19/2019 PASS
DetailsMichael Hanson
Case Summary (BLD)  8/19/2019 DONE
DetailsMichael Hanson
Print Occupancy Form  8/19/2019 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/19/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  8/19/2019 DONE
met
Telephone call  8/19/2019 DONE
spoke with duane informing him that this permit is ready and the fee amount due for issuance
Routing - PLAN CHECK8/9/2019 8/9/2019 FAIL
DetailsMichael Hanson
Resubmittal didn't satisfy corrections required. Please resubmit with resolution to minimum bathroom requirements.
Plan Reviewer's activity  8/9/2019 DONE
DetailsMichael Hanson
Emailed applicant with direction for completion.
Plan Reviewer's activity  8/9/2019 DONE
DetailsMichael Hanson
Contacted the applicant via phone to discuss a path forward for corrections required due to the warehouse bathroom requirements.
Plan resubmittals received  8/8/2019 DONE
Two Copies of bathroom plan stamped and taken to plan reviewer.
Route to Impact Fee Review8/6/20198/9/20198/7/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK8/2/2019 8/6/2019 FAIL
DetailsMichael Hanson
See emailed building plan review report for corrections required.
Routing - FIRE8/2/2019 8/6/2019 PASS
DetailsMark Scharfen
08.06.2019-completed fire review. made notations on plans. No report (small TI).
1st review completed  8/6/2019 FAIL
DetailsMichael Hanson
See emailed building plan review report.
Routing - Addressing8/2/2019 8/5/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS8/2/2019 8/5/2019 PASS
DetailsAngela Hardy
Plans ACCEPTED BY PLAN TECH  8/2/2019 DONE
Recd Pcfee & Taken To Pln CK  8/2/2019 DONE
Intake Approval  8/2/2019 PASS
Application received 8/2/2019